Marine, offshore & industrial services: SOP templates for yards and contractors

Editable SOP templates for a ship-repair yard, an instrumentation and calibration provider and a marine-electrical and offshore contractor: docking, kickoff, permits, installation, calibration, commissioning and handover.

Thirty SOPs from three kinds of industrial service company, a ship-repair yard, an instrumentation and calibration provider and a marine-electrical contractor working on vessels and offshore installations, with the permit-to-work, maintenance and project delivery families they run in common. The hub is organized by what each company does to a customer's asset, from a vessel arriving at the quay to a signed handover dossier.

Ship repair is the yard's job in six SOPs: arrival and docking against the berth plan and the tidal window, dry docking on a verified block plan, a kickoff that turns the owner's specification into work packages by discipline, subcontractor onboarding to fill the gaps, a quality inspection that runs from self-check through independent QA, NDT and the class surveyor to customer acceptance, and a handover that closes the punch list before the vessel departs. The hot work and confined space permits, the 24/7 emergency line and the change order run beside a docking rather than inside it.

Instrumentation services follows one instrument from requirement to a calibration interval adjusted on drift evidence: selection from process conditions, installation under permit with a loop test, calibration and documentation with as-found and as-left readings and a certificate an auditor can follow, and the planning SOP that sets criticality and interval. Marine electrical is the contractor's route: certified technicians mobilized to site, cabling and panels installed to approved drawings, a test list the installation must pass, and energization and commissioning under a signed approval; the turnkey project, high-voltage work and the design change sit around it.

The three share what every industrial site shares: permit to work is cross-listed from the generic safety family beside the yard's own permit SOPs, maintenance holds the generator and motor service and the calibration planning a service contract runs on, and project delivery holds the two end-to-end delivery SOPs next to the generic governance, change and closure templates. The library covers mobilization, execution, inspection, commissioning, punch list and handover on a customer's existing asset. It does not cover the contractor's own bid: every tender and award template is the buyer sourcing a supplier, and there is no site establishment, inspection and test plan or claims procedure.

Prove the work to the customer, the class and the permit

A service company's process ends with someone else's signature: a class surveyor's, a responsible engineer's energization approval, a customer's acceptance of a calibration certificate. These SOPs draw the route to that signature with the gates in the order they are actually held, the permit before the hot work, the de-energized checks before commissioning, the as-found reading before any adjustment, so the dossier at handover is the record of the job rather than a reconstruction of it. They are three companies' operating procedures generalized into editable starting points; adapt the certifications, the permit system and the class requirements to your site and your customers.

Featured templates

  • Turnkey Marine Electrical Project SOP

    A turnkey marine electrical project SOP for full-scope work: Scanel owns requirements, planning, engineering, procurement, installation, testing and commissioning through documentation, customer acceptance and closeout.

  • Dry docking and undocking SOP: block plan to refloat

    A shipyard SOP for dry docking and undocking a vessel: block plan verification, controlled dewatering, a stability check, dry-period repair work, and refloat, with an owner and workload hours on every step.

  • Instrument Calibration & Documentation SOP

    Insatech's core calibration SOP: verify traceable reference equipment, record as-found readings before adjustment and as-left readings after, then issue a certificate an auditor can follow end to end.

  • Offshore / Wind Project Mobilization SOP

    An offshore and wind project mobilization SOP for Scanel: a hard GWO and offshore safety certification gate, equipment and travel logistics, site safety induction, work execution and a demobilization test-result gate.

Process families

Ship repair

Ship repair is the yard's core job: bring a vessel alongside or onto the blocks, turn the owner's specification into work packages the workshops and subcontractors can execute, prove every repair to QA, class and the customer, and send the vessel away with a closed punch list and a dossier. This family orders six SOPs in that sequence and adds the permits, the 24/7 line and the change order that run beside a docking.

  1. Vessel arrival and docking SOP (ship-repair yard)

    A vessel arrival and docking SOP for a ship-repair yard: pre-arrival berth checks, pilot and tug booking, the weather and tidal go or hold decision, pilotage, mooring, and a signed handover to the project team.

  2. Dry docking and undocking SOP: block plan to refloat

    A shipyard SOP for dry docking and undocking a vessel: block plan verification, controlled dewatering, a stability check, dry-period repair work, and refloat, with an owner and workload hours on every step.

  3. Ship repair project kickoff SOP: specification to work packages

    A ship repair project kickoff SOP: specification intake, mechanical/electrical/hydraulic review, PM assignment, work-package breakdown, subcontractor gap-fill, scheduling, and a confirm/revise kickoff before work reaches the workshops.

  4. Shipyard subcontractor onboarding SOP: induction to checkout

    A shipyard subcontractor onboarding SOP for ship repair yards: document and insurance verification, a pass/fail safety induction, access and PPE issue, a hot work or confined space permit decision, supervised work and checkout.

  5. Shipboard repair quality inspection SOP

    A shipboard repair quality inspection SOP for ship-repair yards: technician self-check, independent QA/QC inspection, conditional NDT verification, class surveyor sign-off, and customer acceptance before the record is filed and closed out.

  6. Vessel repair handover SOP: completion review to departure

    A shipyard SOP for vessel repair completion and handover: outstanding-item review, testing and commissioning, QA documentation, customer and class inspection, punch-list closure, and undocking, with an owner and workload hours per step.

Also part of this family

  • Hot work permit SOP: gas test, fire watch, and closure — A hot work permit SOP for ship repair: gas-test the atmosphere, assign a fire watch, get dock master and HSE sign-off, then hold a mandatory post-work watch before the permit closes.
  • Confined space entry SOP for ship repair yards — A confined space entry SOP for ship-repair yards: risk assessment, isolation and ventilation, atmosphere testing, permit issue, standby and rescue readiness, entry, and permit closeout.
  • Emergency repair request SOP (24/7 triage to release) — How a ship-repair yard turns a defect reported on the 24/7 duty line into a triaged, quoted or mobilized repair: urgency triage, customer approval, mechanical/electrical/hydraulic mobilization, function test and vessel release.
  • Change order approval SOP for a ship repair yard — A change order approval SOP for ship repair: a mid-repair finding is assessed against original scope, estimated, submitted to the customer for approval, executed, QA/QC inspected, and filed on closeout.

View the sequence

Marine electrical

Marine electrical is the contractor's work on a vessel or an offshore installation: get certified technicians to site, install cabling and panels to approved drawings, test what was installed, and energise and commission it under a signed approval. This family orders four SOPs in that sequence and adds the six around a job, from the turnkey project and the 24/7 repair line to high-voltage work and the design change that precedes an installation.

  1. Offshore / Wind Project Mobilization SOP

    An offshore and wind project mobilization SOP for Scanel: a hard GWO and offshore safety certification gate, equipment and travel logistics, site safety induction, work execution and a demobilization test-result gate.

  2. Marine Electrical Installation SOP

    A marine electrical installation SOP for Scanel: engineering review, material verification, work preparation, hands-on installation, a workmanship inspection gate, de-energized checks, documentation and handover to commissioning.

  3. Electrical Inspection & Testing SOP

    An electrical inspection and testing SOP for Scanel: identifying the installation, defining which tests actually apply, safety preparation, performing the tests, assessing results, and issuing an archived report, with no other job attached.

  4. Electrical System Commissioning SOP

    An electrical system commissioning SOP for Scanel: pre-energization inspection and testing, a hard energization-approval gate, functional testing with a fault-resolution loop, a commissioning report and signed customer handover.

Also part of this family

  • Turnkey Marine Electrical Project SOP — A turnkey marine electrical project SOP for full-scope work: Scanel owns requirements, planning, engineering, procurement, installation, testing and commissioning through documentation, customer acceptance and closeout.
  • Emergency Marine Electrical Repair SOP — An emergency marine electrical repair SOP for Scanel's 24/7 service line: fault triage, an operational and safety impact decision, on-board diagnosis, repair or replacement, load-tested verification, and return to service.
  • High-Voltage Electrical Work SOP — A high-voltage electrical work SOP for Scanel's strictest, safety-gated jobs: a written isolation plan, a named Authorized Person authorization gate, and a verified de-energization check before anyone touches the system.
  • Generator & Electric Motor Maintenance SOP — A generator and electric motor maintenance SOP for rotating machinery: equipment identification, electrical and mechanical testing, a vibration-analysis judgment call, repair, a test-run gate, and a documented return to service.
  • Electrical Engineering & Design Change SOP — An electrical engineering and design change SOP for Scanel: technical assessment, system design, drawings and schematics, an engineering review, and a customer-approval gate on the design before installation and commissioning begin.
  • ATEX / EEx Equipment Service SOP — An ATEX/EEx equipment service SOP for equipment already installed in a classified hazardous area: certification verification, isolation, inspection, service or repair, and a hard compliance re-verification gate before return to operation.

View the sequence

Instrumentation services

Instrumentation services is the work of a provider that specifies, installs, calibrates and maintains process instruments on a customer's plant. This family orders four SOPs in the sequence one instrument moves through them, from a customer requirement to a calibration interval adjusted on drift evidence, and adds the six procedures that hang off that chain.

  1. New Instrument Selection & Specification SOP

    A new instrument selection and specification SOP: understanding process conditions, choosing the right measurement principle, checking compliance, and a customer technical-approval gate before any instrument is quoted or ordered.

  2. Process Instrument Installation & Commissioning SOP

    An instrument installation and commissioning SOP: equipment verification, safety preparation, installation, electrical and mechanical checks, configuration, loop testing, calibration and a signed customer handover.

  3. Instrument Calibration & Documentation SOP

    Insatech's core calibration SOP: verify traceable reference equipment, record as-found readings before adjustment and as-left readings after, then issue a certificate an auditor can follow end to end.

  4. Preventive Maintenance & Calibration Planning SOP

    A preventive maintenance and calibration planning SOP for instruments under a service agreement: criticality assessment, interval determination, scheduled maintenance, drift-trend analysis and evidence-based interval adjustment.

Also part of this family

  • Out-of-Tolerance Calibration SOP — An out-of-tolerance calibration SOP for Insatech: assessing how far and which way an instrument drifted, determining what it affected, notifying the customer before touching it, then correcting and recalibrating.
  • On-Site Service Request & Dispatch SOP — An on-site service request and dispatch SOP for Insatech: ServiceDesk intake and triage, the remote-versus-on-site decision, technician assignment, equipment preparation, the customer visit and the service report that closes every case.
  • Emergency instrument troubleshooting SOP (instrumentation service provider) — An emergency instrument troubleshooting SOP: gathering process data on a fault that isn't yet named, diagnosing which instrument is implicated, weighing safety and production urgency, then choosing a remote fix or field dispatch.
  • Turnaround / plant shutdown service SOP — A turnaround and plant shutdown service SOP for instrumentation: scope and resource the shutdown window with the customer, coordinate safety, isolate, calibrate, repair and certify every covered instrument before the final report.
  • ATEX Instrument Selection & Installation SOP — An ATEX instrument selection and installation SOP for classified hazardous areas: zone classification, a hard ATEX marking-verification gate, technical review, hazardous-area installation requirements, inspection and commissioning.
  • Customer Project Delivery SOP: Instrumentation & Automation Solution — A customer project delivery SOP for a full instrumentation and automation solution: engineering, instrument selection, customer approval, procurement, FAT, installation, commissioning, documentation and operator training.

View the sequence

Permit to work

Permit to work is the control system that turns hazardous work into authorized work: the people on site are inducted and briefed, the job is screened and assessed, isolations are applied and proved, an authorized person issues a time-limited permit at the worksite, the atmosphere is tested and kept tested, and anyone can stop the job. Five templates form the spine; eleven cover the permit types, the isolations and the yard-specific SOPs.

  1. Contractor safety induction process flowchart (site access)

    Contractor safety induction flowchart template: pre-qualification check, ID and certificate checks at the gate, site rules and emergency briefing, work area walk, assessment, badge issue with an expiry and supervised first shift.

  2. Toolbox talk process flowchart (daily pre-task safety briefing)

    Toolbox talk flowchart template: topic from the talk plan or a recent incident, controls from the risk assessment, the talk delivered at the workface, issues fixed, logged or stopped, attendance recorded.

  3. Permit to work process flowchart (issue, suspend, hand back)

    Permit to work process flowchart template: screening, risk assessment, permit type, isolation and proving, second signature, issue and display, suspension, shift handover, hand-back and cancellation.

  4. Gas testing process flowchart (permit-to-work atmospheric testing)

    Gas testing flowchart template: test called on the permit, authorised tester, calibration and bump test, oxygen then LEL then toxics, a limits decision, ventilate and retest, continuous monitoring and alarm response.

  5. Stop work authority process flowchart (stop to resumption)

    Stop work authority flowchart template: stop the job and warn those affected, make the area safe, agree the hazard, fix it or escalate, authorise resumption in writing, and protect the person who stopped.

Also part of this family

View the sequence

Maintenance

Maintenance is the cycle that keeps plant running: a request or a due date becomes a work order, the work is planned against parts and a downtime window, done as preventive or corrective work, tested back into service and closed with a costed record. The templates below follow that cycle in order, with the unplanned and the specialized cases alongside.

  1. Maintenance work order process flowchart (request to close-out)

    Maintenance work order process flowchart template: request approval, work order creation with type and priority, parts availability, weekly scheduling, execution, additional work handling and costed close-out.

  2. Preventive maintenance process flowchart (scheduled PM)

    Preventive maintenance process flowchart template: interval or meter trigger, planned work order, parts kit, isolation, PM task list, test and handback.

  3. Corrective maintenance process flowchart (planned repair of a known defect)

    Corrective maintenance process flowchart template: defect report, triage and priority, safe-to-run decision, job planning, parts and lead time, deferral approval, scheduled repair, test and failure code close-out.

  4. Equipment maintenance process flowchart

    Five-lane equipment maintenance process flowchart: work request, planned or breakdown triage, job planning, spares check, permit to work and costed close-out.

  5. Equipment failure investigation process flowchart (RCFA)

    Equipment failure investigation process flowchart template: investigation trigger, preserved evidence, failure mode, root cause analysis, corrective actions and monitored effectiveness.

Also part of this family

  • Maintenance shutdown process flowchart (planned turnaround) — Maintenance shutdown process flowchart template: worklist and scope freeze, contractor and permit planning, readiness go/no-go, isolation, emergent-work approval, testing, start-up and close-out record.
  • Preventive Maintenance & Calibration Planning SOP — A preventive maintenance and calibration planning SOP for instruments under a service agreement: criticality assessment, interval determination, scheduled maintenance, drift-trend analysis and evidence-based interval adjustment.
  • Generator & Electric Motor Maintenance SOP — A generator and electric motor maintenance SOP for rotating machinery: equipment identification, electrical and mechanical testing, a vibration-analysis judgment call, repair, a test-run gate, and a documented return to service.

View the sequence

Project delivery

Project delivery is the set of controls that keep a project inside its agreed scope, cost and schedule and end it properly. The templates here are a group rather than a sequence: one governance backbone, the change and risk processes it calls, two decision trees for gates and escalations, a closure process, and two end-to-end delivery SOPs from engineering firms.

How the processes connect

All Marine, offshore & industrial services templates

Ship repair

  • Vessel arrival and docking SOP (ship-repair yard) — A vessel arrival and docking SOP for a ship-repair yard: pre-arrival berth checks, pilot and tug booking, the weather and tidal go or hold decision, pilotage, mooring, and a signed handover to the project team.
  • Dry docking and undocking SOP: block plan to refloat — A shipyard SOP for dry docking and undocking a vessel: block plan verification, controlled dewatering, a stability check, dry-period repair work, and refloat, with an owner and workload hours on every step.
  • Ship repair project kickoff SOP: specification to work packages — A ship repair project kickoff SOP: specification intake, mechanical/electrical/hydraulic review, PM assignment, work-package breakdown, subcontractor gap-fill, scheduling, and a confirm/revise kickoff before work reaches the workshops.
  • Shipboard repair quality inspection SOP — A shipboard repair quality inspection SOP for ship-repair yards: technician self-check, independent QA/QC inspection, conditional NDT verification, class surveyor sign-off, and customer acceptance before the record is filed and closed out.
  • Emergency repair request SOP (24/7 triage to release) — How a ship-repair yard turns a defect reported on the 24/7 duty line into a triaged, quoted or mobilized repair: urgency triage, customer approval, mechanical/electrical/hydraulic mobilization, function test and vessel release.
  • Change order approval SOP for a ship repair yard — A change order approval SOP for ship repair: a mid-repair finding is assessed against original scope, estimated, submitted to the customer for approval, executed, QA/QC inspected, and filed on closeout.
  • Shipyard subcontractor onboarding SOP: induction to checkout — A shipyard subcontractor onboarding SOP for ship repair yards: document and insurance verification, a pass/fail safety induction, access and PPE issue, a hot work or confined space permit decision, supervised work and checkout.
  • Vessel repair handover SOP: completion review to departure — A shipyard SOP for vessel repair completion and handover: outstanding-item review, testing and commissioning, QA documentation, customer and class inspection, punch-list closure, and undocking, with an owner and workload hours per step.

Marine electrical

  • Marine Electrical Installation SOP — A marine electrical installation SOP for Scanel: engineering review, material verification, work preparation, hands-on installation, a workmanship inspection gate, de-energized checks, documentation and handover to commissioning.
  • Electrical System Commissioning SOP — An electrical system commissioning SOP for Scanel: pre-energization inspection and testing, a hard energization-approval gate, functional testing with a fault-resolution loop, a commissioning report and signed customer handover.
  • Emergency Marine Electrical Repair SOP — An emergency marine electrical repair SOP for Scanel's 24/7 service line: fault triage, an operational and safety impact decision, on-board diagnosis, repair or replacement, load-tested verification, and return to service.
  • High-Voltage Electrical Work SOP — A high-voltage electrical work SOP for Scanel's strictest, safety-gated jobs: a written isolation plan, a named Authorized Person authorization gate, and a verified de-energization check before anyone touches the system.
  • Electrical Inspection & Testing SOP — An electrical inspection and testing SOP for Scanel: identifying the installation, defining which tests actually apply, safety preparation, performing the tests, assessing results, and issuing an archived report, with no other job attached.
  • Generator & Electric Motor Maintenance SOP — A generator and electric motor maintenance SOP for rotating machinery: equipment identification, electrical and mechanical testing, a vibration-analysis judgment call, repair, a test-run gate, and a documented return to service.
  • Electrical Engineering & Design Change SOP — An electrical engineering and design change SOP for Scanel: technical assessment, system design, drawings and schematics, an engineering review, and a customer-approval gate on the design before installation and commissioning begin.
  • Turnkey Marine Electrical Project SOP — A turnkey marine electrical project SOP for full-scope work: Scanel owns requirements, planning, engineering, procurement, installation, testing and commissioning through documentation, customer acceptance and closeout.
  • ATEX / EEx Equipment Service SOP — An ATEX/EEx equipment service SOP for equipment already installed in a classified hazardous area: certification verification, isolation, inspection, service or repair, and a hard compliance re-verification gate before return to operation.
  • Offshore / Wind Project Mobilization SOP — An offshore and wind project mobilization SOP for Scanel: a hard GWO and offshore safety certification gate, equipment and travel logistics, site safety induction, work execution and a demobilization test-result gate.

Instrumentation services

  • Instrument Calibration & Documentation SOP — Insatech's core calibration SOP: verify traceable reference equipment, record as-found readings before adjustment and as-left readings after, then issue a certificate an auditor can follow end to end.
  • Out-of-Tolerance Calibration SOP — An out-of-tolerance calibration SOP for Insatech: assessing how far and which way an instrument drifted, determining what it affected, notifying the customer before touching it, then correcting and recalibrating.
  • On-Site Service Request & Dispatch SOP — An on-site service request and dispatch SOP for Insatech: ServiceDesk intake and triage, the remote-versus-on-site decision, technician assignment, equipment preparation, the customer visit and the service report that closes every case.
  • Emergency instrument troubleshooting SOP (instrumentation service provider) — An emergency instrument troubleshooting SOP: gathering process data on a fault that isn't yet named, diagnosing which instrument is implicated, weighing safety and production urgency, then choosing a remote fix or field dispatch.
  • New Instrument Selection & Specification SOP — A new instrument selection and specification SOP: understanding process conditions, choosing the right measurement principle, checking compliance, and a customer technical-approval gate before any instrument is quoted or ordered.
  • Process Instrument Installation & Commissioning SOP — An instrument installation and commissioning SOP: equipment verification, safety preparation, installation, electrical and mechanical checks, configuration, loop testing, calibration and a signed customer handover.
  • Preventive Maintenance & Calibration Planning SOP — A preventive maintenance and calibration planning SOP for instruments under a service agreement: criticality assessment, interval determination, scheduled maintenance, drift-trend analysis and evidence-based interval adjustment.
  • Turnaround / plant shutdown service SOP — A turnaround and plant shutdown service SOP for instrumentation: scope and resource the shutdown window with the customer, coordinate safety, isolate, calibrate, repair and certify every covered instrument before the final report.
  • ATEX Instrument Selection & Installation SOP — An ATEX instrument selection and installation SOP for classified hazardous areas: zone classification, a hard ATEX marking-verification gate, technical review, hazardous-area installation requirements, inspection and commissioning.
  • Customer Project Delivery SOP: Instrumentation & Automation Solution — A customer project delivery SOP for a full instrumentation and automation solution: engineering, instrument selection, customer approval, procurement, FAT, installation, commissioning, documentation and operator training.

Permit to work

Maintenance

Asset lifecycle

QueryChart features for Marine, offshore & industrial services

Related industries

Browse the full SOP templates library

Browse the full Permit to work and industrial safety process templates library

Browse the full Maintenance and asset management process templates library

More in Industries