SOP templates

Controlled standard operating procedure (SOP) templates: approval-tracked, version-controlled, audit-ready. Replace your Word-document SOP library with a controlled platform.

SOP templates in this category

  • Controlled SOP template: approval-tracked, version-controlled — A controlled SOP (standard operating procedure) template (purpose, scope, responsibilities, procedure steps, and references) with approval workflow, version control, and audit trail attached.
  • Vessel arrival and docking SOP (ship-repair yard) — A vessel arrival and docking SOP for a ship-repair yard: pre-arrival berth checks, pilot and tug booking, the weather and tidal go or hold decision, pilotage, mooring, and a signed handover to the project team.
  • Dry docking and undocking SOP: block plan to refloat — A shipyard SOP for dry docking and undocking a vessel: block plan verification, controlled dewatering, a stability check, dry-period repair work, and refloat, with an owner and workload hours on every step.
  • Ship repair project kickoff SOP: specification to work packages — A ship repair project kickoff SOP: specification intake, mechanical/electrical/hydraulic review, PM assignment, work-package breakdown, subcontractor gap-fill, scheduling, and a confirm/revise kickoff before work reaches the workshops.
  • Hot work permit SOP: gas test, fire watch, and closure — A hot work permit SOP for ship repair: gas-test the atmosphere, assign a fire watch, get dock master and HSE sign-off, then hold a mandatory post-work watch before the permit closes.
  • Confined space entry SOP for ship repair yards — A confined space entry SOP for ship-repair yards: risk assessment, isolation and ventilation, atmosphere testing, permit issue, standby and rescue readiness, entry, and permit closeout.
  • Shipboard repair quality inspection SOP — A shipboard repair quality inspection SOP for ship-repair yards: technician self-check, independent QA/QC inspection, conditional NDT verification, class surveyor sign-off, and customer acceptance before the record is filed and closed out.
  • Emergency repair request SOP (24/7 triage to release) — How a ship-repair yard turns a defect reported on the 24/7 duty line into a triaged, quoted or mobilized repair: urgency triage, customer approval, mechanical/electrical/hydraulic mobilization, function test and vessel release.
  • Change order approval SOP for a ship repair yard — A change order approval SOP for ship repair: a mid-repair finding is assessed against original scope, estimated, submitted to the customer for approval, executed, QA/QC inspected, and filed on closeout.
  • Shipyard subcontractor onboarding SOP: induction to checkout — A shipyard subcontractor onboarding SOP for ship repair yards: document and insurance verification, a pass/fail safety induction, access and PPE issue, a hot work or confined space permit decision, supervised work and checkout.
  • Vessel repair handover SOP: completion review to departure — A shipyard SOP for vessel repair completion and handover: outstanding-item review, testing and commissioning, QA documentation, customer and class inspection, punch-list closure, and undocking, with an owner and workload hours per step.
  • Instrument Calibration & Documentation SOP — Insatech's core calibration SOP: verify traceable reference equipment, record as-found readings before adjustment and as-left readings after, then issue a certificate an auditor can follow end to end.
  • Out-of-Tolerance Calibration SOP — An out-of-tolerance calibration SOP for Insatech: assessing how far and which way an instrument drifted, determining what it affected, notifying the customer before touching it, then correcting and recalibrating.
  • On-Site Service Request & Dispatch SOP — An on-site service request and dispatch SOP for Insatech: ServiceDesk intake and triage, the remote-versus-on-site decision, technician assignment, equipment preparation, the customer visit and the service report that closes every case.
  • Emergency instrument troubleshooting SOP (instrumentation service provider) — An emergency instrument troubleshooting SOP: gathering process data on a fault that isn't yet named, diagnosing which instrument is implicated, weighing safety and production urgency, then choosing a remote fix or field dispatch.
  • New Instrument Selection & Specification SOP — A new instrument selection and specification SOP: understanding process conditions, choosing the right measurement principle, checking compliance, and a customer technical-approval gate before any instrument is quoted or ordered.
  • Process Instrument Installation & Commissioning SOP — An instrument installation and commissioning SOP: equipment verification, safety preparation, installation, electrical and mechanical checks, configuration, loop testing, calibration and a signed customer handover.
  • Preventive Maintenance & Calibration Planning SOP — A preventive maintenance and calibration planning SOP for instruments under a service agreement: criticality assessment, interval determination, scheduled maintenance, drift-trend analysis and evidence-based interval adjustment.
  • Turnaround / plant shutdown service SOP — A turnaround and plant shutdown service SOP for instrumentation: scope and resource the shutdown window with the customer, coordinate safety, isolate, calibrate, repair and certify every covered instrument before the final report.
  • ATEX Instrument Selection & Installation SOP — An ATEX instrument selection and installation SOP for classified hazardous areas: zone classification, a hard ATEX marking-verification gate, technical review, hazardous-area installation requirements, inspection and commissioning.
  • Customer Project Delivery SOP: Instrumentation & Automation Solution — A customer project delivery SOP for a full instrumentation and automation solution: engineering, instrument selection, customer approval, procurement, FAT, installation, commissioning, documentation and operator training.
  • Marine Electrical Installation SOP — A marine electrical installation SOP for Scanel: engineering review, material verification, work preparation, hands-on installation, a workmanship inspection gate, de-energized checks, documentation and handover to commissioning.
  • Electrical System Commissioning SOP — An electrical system commissioning SOP for Scanel: pre-energization inspection and testing, a hard energization-approval gate, functional testing with a fault-resolution loop, a commissioning report and signed customer handover.
  • Emergency Marine Electrical Repair SOP — An emergency marine electrical repair SOP for Scanel's 24/7 service line: fault triage, an operational and safety impact decision, on-board diagnosis, repair or replacement, load-tested verification, and return to service.
  • High-Voltage Electrical Work SOP — A high-voltage electrical work SOP for Scanel's strictest, safety-gated jobs: a written isolation plan, a named Authorized Person authorization gate, and a verified de-energization check before anyone touches the system.
  • Electrical Inspection & Testing SOP — An electrical inspection and testing SOP for Scanel: identifying the installation, defining which tests actually apply, safety preparation, performing the tests, assessing results, and issuing an archived report, with no other job attached.
  • Generator & Electric Motor Maintenance SOP — A generator and electric motor maintenance SOP for rotating machinery: equipment identification, electrical and mechanical testing, a vibration-analysis judgment call, repair, a test-run gate, and a documented return to service.
  • Electrical Engineering & Design Change SOP — An electrical engineering and design change SOP for Scanel: technical assessment, system design, drawings and schematics, an engineering review, and a customer-approval gate on the design before installation and commissioning begin.
  • Turnkey Marine Electrical Project SOP — A turnkey marine electrical project SOP for full-scope work: Scanel owns requirements, planning, engineering, procurement, installation, testing and commissioning through documentation, customer acceptance and closeout.
  • ATEX / EEx Equipment Service SOP — An ATEX/EEx equipment service SOP for equipment already installed in a classified hazardous area: certification verification, isolation, inspection, service or repair, and a hard compliance re-verification gate before return to operation.
  • Offshore / Wind Project Mobilization SOP — An offshore and wind project mobilization SOP for Scanel: a hard GWO and offshore safety certification gate, equipment and travel logistics, site safety induction, work execution and a demobilization test-result gate.

UK emergency medicine clinical algorithms

Source-linked educational visual algorithms for adult emergency medicine, built from current UK clinical guidance and designed for reference, not protocol substitution.

Browse all UK emergency medicine clinical algorithms

Browse all Process flowchart templates