Suspected pulmonary embolism assessment (adult UK pathway)

A source-linked educational visual of adult suspected pulmonary embolism assessment, Wells scoring, D-dimer testing and imaging from NICE NG158.

Important safety note

This visual algorithm is an educational representation of published UK clinical guidance and is not a substitute for clinical judgement, local protocols, senior/specialist advice, or the original guideline. Verify current guidance before clinical use.

Scope and source

Scope
Adults with suspected pulmonary embolism in UK emergency and acute-care settings.
Jurisdiction
UK
Primary guidance
NICE NG158: Venous thromboembolic diseases: diagnosis, management and thrombophilia testing
Guidance last updated
2023-08-02
Clinical reference reviewed
2026-09-08
Review due
2027-03-08

Interactive clinical algorithm

This source-backed visual algorithm is available in the interactive page experience. Open the original guidance and the node notes before clinical use.

How to read this visual

  • Read across the columns for the phases of the pathway; the swimlanes are who acts — Emergency team, Scoring, bloods and imaging.
  • Bold marks the dose, threshold or time limit that decides the next step; the rest of a label is context.
  • Start with physiological stability before following the diagnostic branch.
  • Read the node notes for time-critical anticoagulation and imaging qualifications.

Clinical notes

  • Pregnancy, contrast contraindication and imaging availability require the relevant specialist/local pathway.
  • Use the live NICE recommendation and local anticoagulation policy for treatment decisions.

Sources

Open an editable reference copy

Create a personal educational copy. Verify the original guidance before clinical use.

Open an editable reference copy

More in Emergency medicine clinical algorithms

Browse all Emergency medicine clinical algorithms