Acute stroke assessment (adult UK pathway)

A source-linked educational visual of adult acute stroke recognition, urgent imaging, reperfusion decisions and stroke-unit care from NICE NG128.

Important safety note

This visual algorithm is an educational representation of published UK clinical guidance and is not a substitute for clinical judgement, local protocols, senior/specialist advice, or the original guideline. Verify current guidance before clinical use.

Scope and source

Scope
Adults with suspected acute stroke in UK emergency and acute-care services.
Jurisdiction
UK
Primary guidance
NICE NG128: Stroke and transient ischaemic attack in over 16s
Guidance last updated
2022-11-23
Clinical reference reviewed
2026-09-08
Review due
2027-03-08

Interactive clinical algorithm

This source-backed visual algorithm is available in the interactive page experience. Open the original guidance and the node notes before clinical use.

How to read this visual

  • Read across the columns for the phases of the pathway; the swimlanes are who acts — Emergency team, Imaging and radiology, Stroke and neurosurgical specialists.
  • Bold marks the dose, threshold or time limit that decides the next step; the rest of a label is context.
  • Record last-known-well time and activate the stroke pathway while performing ABCDE assessment.
  • Open node notes for imaging, reperfusion timing and antiplatelet sequencing.

Clinical notes

  • Thrombolysis and thrombectomy eligibility require organised stroke-service assessment.
  • Use local transfer, anticoagulant-reversal, blood-pressure and posterior-circulation protocols.

Sources

Open an editable reference copy

Create a personal educational copy. Verify the original guidance before clinical use.

Open an editable reference copy

More in Emergency medicine clinical algorithms

Browse all Emergency medicine clinical algorithms