Process families
Process families
End-to-end processes that cross departments and industries, each shown as the sequence of templates that make it up.
Finance & payments
Procure-to-pay
The procure-to-pay chain as six linked flowcharts: purchase requisition, purchase order, goods receipt, three-way matching, invoice approval and payment approval, with the P2P overviews, vendor onboarding and procurement alongside.
25 templates
Purchase requisition process flowchart → Purchase order process flowchart → Goods receiving process flowchart (goods-in to GRN) → Three-way matching process flowchart
Accounts payable
Eight accounts payable flowcharts: the full AP cycle, invoice approval, three-way matching, payment approval, supplier setup and bank-detail changes, and the two expense claim routes that end in the same payment run.
8 templates
Order-to-cash
The order-to-cash chain as six linked flowcharts: customer credit approval, order fulfillment, proof of delivery, invoice-to-cash, accounts receivable and bank reconciliation, with the O2C and quote-to-cash overviews and the refund path.
14 templates
Customer credit approval process flowchart (limit and terms) → Order fulfillment process flowchart template → Proof of delivery process flowchart (ePOD capture to invoice) → Invoice-to-cash process flowchart
Financial close
The period-end close as four linked flowcharts: journal entry approval, account reconciliation, month-end close and financial reporting, with the record-to-report overview, bank reconciliation and fixed asset controls alongside.
7 templates
Journal entry approval workflow → Account reconciliation process flowchart → Month-end close process flowchart (calendar to sign-off) → Financial reporting process flowchart
Spend governance
Seven flowcharts for deciding whether money may be committed: the annual budget, budget approval, purchase approval by threshold, expense approval, conflict-of-interest review, fixed asset controls and the make-or-buy decision tree.
12 templates
Card payment lifecycle
The life of a card transaction as five linked flowcharts: card payment initiation, authorization, the transaction state model, clearing and settlement, and payment reconciliation, plus tokenization and exception management.
7 templates
Card payment process flowchart (purchase response to capture) → Payment authorization process flowchart (request to capture) → Card transaction lifecycle flowchart (initiation to monitoring) → Payment clearing and settlement process flowchart template
Disputes and chargebacks
The dispute lifecycle as four linked flowcharts: payment dispute intake, the chargeback across issuer, network, acquirer and merchant, chargeback case management and representment, with the three refund routes that head disputes off.
7 templates
Payment Dispute Process Flowchart → Chargeback process flowchart (participant lifecycle) → Chargeback Management Process Flowchart → Chargeback Representment Process Flowchart
Merchant onboarding and risk
Four linked flowcharts for admitting and watching a merchant: onboarding, risk assessment, payment API integration and monitoring, plus institutional client onboarding, transaction risk assessment, fraud detection and incident response.
8 templates
Merchant onboarding process flowchart (application to go-live) → Merchant risk assessment process flowchart (profile to monitoring) → Payment API integration process flowchart template → Merchant monitoring process flowchart (signals to risk feedback)
Quality & compliance
Nonconformance to CAPA
How a failed check becomes a deviation, a root cause, a CAPA and a controlled change, and how you prove the action worked. Six sequenced flowcharts plus the supplier, laboratory and audit-finding variants of the same loop.
12 templates
Quality control process flowchart → Deviation management process flowchart → Root cause analysis process flowchart → CAPA process flowchart (corrective and preventive action)
Document control
How a controlled document moves from change request through drafting, version numbering, reviewer and approver routing, release and periodic review. Five sequenced templates plus revision logs, SOP change control and a controlled SOP form.
13 templates
Document control process flowchart → Document version control template → Document approval workflow decision tree template → Document change control workflow flowchart
Change control
Change control templates for a quality system, IT production, an SOP, a controlled document, a furniture design, a laboratory method, a plant modification, a project baseline and a ship repair scope: one gate, different change authorities.
12 templates
Supplier quality
The supplier quality cycle in seven flowcharts: risk tier, selection, approval to the vendor list, incoming inspection, supplier corrective action, second-party audit and ongoing evaluation, plus food, furniture and SOC 2 variants.
17 templates
Supplier risk assessment flowchart (decision tree) → Supplier selection process flowchart with weighted scoring → Vendor approval process flowchart template → Incoming inspection process flowchart (goods-in quality)
Internal audit
The internal audit cycle in five templates: risk-based program and fieldwork, checklist, corrective action follow-up, escalation of overdue actions and the management review that closes the loop, with ISO 9001 and laboratory variants.
10 templates
Internal audit process flowchart template → Audit checklist workflow: flowchart from draft to record → Corrective action follow-up process flowchart (audit findings) → Audit finding escalation process flowchart (overdue actions)
Complaint handling
Complaint handling templates for a quality department, a support desk, a medical device manufacturer, a food producer and a furniture maker, plus the escalation decision tree, the warranty claim and the product recall it can end in.
8 templates
Inspection
Nine inspection templates: incoming goods, shop-floor and in-process checks, first article inspection, pre-delivery and final inspection, and the safety, workplace and equipment inspections. Each ends in a release, a hold or an action.
9 templates
Risk management
Risk management templates for a quality system, a project, a laboratory and a security function: the assessment cycle, the register a project runs, the escalation decision tree, the formal acceptance test and batch release as a disposition.
8 templates
Supply chain & warehousing
Warehouse inbound
Three linked templates for the inbound dock — warehouse receiving, the WMS receipt transaction and putaway — plus goods-in, cross-dock, incoming inspection and material receiving variants of the same handoff.
8 templates
Warehouse Receiving Process → WMS Receiving Process → Warehouse Putaway Process
Warehouse outbound
Four templates in sequence — pick-face replenishment, order picking, packing and shipping — plus the short-pick exception, kitting, proof of delivery and the combined pick-pack-ship charts.
10 templates
Warehouse Replenishment Process → Warehouse Order Picking Process → Warehouse Packing Process → Warehouse Shipping Process
Inventory control
Templates for keeping the stock record true: the inventory management loop, cycle counting, discrepancy investigation, pick-face and material replenishment, demand and production planning, and the exception and WMS-downtime controls.
13 templates
Returns and reverse logistics
Six templates for goods coming back: the warehouse returns flow from RMA to disposition, the customer-facing RMA-to-refund path, reverse logistics with supplier recovery, delivery damage, bulky-item returns and the refund itself.
6 templates
3PL client lifecycle
Three templates for a third-party logistics client — onboarding from signed contract to hypercare, fulfillment with client-approved exceptions, billing from warehouse events to a verified invoice — plus kitting and cross-docking.
5 templates
3PL Customer Onboarding Process → 3PL Order Fulfillment Process → 3PL Billing Process
Customer, sales & legal
Customer lifecycle
The customer lifecycle as eight linked swimlane flowcharts: lead qualification, the sale, handoff to customer success, onboarding, ticket triage, escalation, cancellation and churn, in the order an account meets them.
8 templates
Sales lead qualification process flowchart: MQL to SAL → Sales process flowchart: prospect to signed order → Sales handoff process flowchart (closed won to customer success) → Customer onboarding process flowchart
Sales pipeline
Five sequenced templates for the sales pipeline: CRM lead management, lead qualification, opportunity management, pipeline stages and lead-to-order, plus the deal desk, discount approval and quote-to-cash charts that gate price and terms.
10 templates
CRM lead management process flowchart (dedupe to conversion) → Sales lead qualification process flowchart: MQL to SAL → Opportunity management process flowchart (stage exit criteria) → Sales pipeline process flowchart: opportunity to closed won
Customer support
Support as a sequence of four templates: ticket triage, tier 2 escalation, service recovery and CSAT follow-up, with the chat handoff, SLA breach, VIP escalation, complaint and refund charts that branch from it.
11 templates
Support ticket triage process flowchart → Customer support escalation process flowchart (tier 1 to tier 2) → Service recovery process flowchart (restoration to customer trust) → CSAT survey follow-up process flowchart
Customer retention
Five templates for keeping or cleanly losing an account: the time-boxed churn save, the churn process from risk signal to win-back, self-service and contracted-account cancellation, and contract renewal seen from the buyer's side.
5 templates
Marketing approvals
Five swimlane flowcharts for the approvals a marketing team runs: web content, social posts, press releases, influencer content and customer case studies, each with its own reviewers, loops and exceptions.
5 templates
Campaign delivery
Marketing delivery as five swimlane flowcharts: request intake, campaign launch, email campaign QA, webinar production and social media crisis response, from the first request to a stand-down decision.
5 templates
Marketing request intake process flowchart (form to backlog review) → Campaign launch process flowchart (brief to post-campaign review) → Email campaign QA process flowchart (build to post-send report)
Contract lifecycle
The contract lifecycle as five sequenced flowcharts: contract review, vendor negotiation, approval against delegated authority, e-signature routing and renewal, with the CLM umbrella and the NDA fast track alongside.
10 templates
Contract review process flowchart: intake to agreed terms → Vendor contract negotiation process flowchart → Contract approval process flowchart (approve, sign, execute) → E-signature routing process flowchart (package to signed record)
Legal operations
Seven legal department templates: litigation intake, legal hold, dispute resolution, GDPR data subject requests, regulatory filings, compliance policy exceptions and trademark clearance, grouped by the matter that triggers each.
7 templates
People
Employee lifecycle
Four swimlane templates that follow one employee from approved vacancy to archived record: recruitment, onboarding, performance review and offboarding, plus the IT provisioning, access removal and payroll runs each step triggers.
7 templates
Recruitment process flowchart: vacancy to offer accepted → Employee onboarding process flowchart → Employee performance review process flowchart template → Employee offboarding process flowchart
Employee relations
Six HR procedures for the cases that arise between hire and exit: employee complaints and formal grievances, the disciplinary process, the PIP decision tree, promotion approval and leave requests, each with its roles, hearings and appeals.
6 templates
Training and competence
Six templates for planning, delivering and recording training: the general training process, the individual record, employee-initiated requests, laboratory analyst authorization, contractor safety induction and the daily toolbox talk.
6 templates
IT & security
IT service management
The IT service management family: incident management, ITIL change management and software release as one chain, with the help desk, severity classification, bug triage, deployment, patch and vulnerability templates that feed work into it.
10 templates
Incident management process flowchart → Change management process flowchart (ITIL) → Software release process flowchart
Access governance
The access governance family: user provisioning, access request, employee access request and access removal as one lifecycle, with the ISO 27001 Annex A.5.15 control and the data access request as parallel routes.
6 templates
User provisioning process flowchart (joiner, mover, leaver) → Access request process flowchart → Employee access request process flowchart (joiner and mover) → User access removal process flowchart (deprovisioning)
Security incident response
The security incident response family: phishing report, severity classification, SOC response, escalation to the CISO, the organizational response and GDPR breach notification, with HIPAA, vulnerability and risk acceptance alongside.
9 templates
Phishing incident response process flowchart (reported email) → Incident severity classification flowchart → Cybersecurity incident response process flowchart (SOC) → Security incident escalation process flowchart (SOC to CISO)
Data & digital
Data governance
How data governance runs as a sequence: the operating model, issue-to-closure decisions, the catalog, quality rules, lineage and lifecycle, with the glossary, access request and legal hold templates alongside.
9 templates
Data governance operating model template → Data governance process flowchart (issue to closure) → Data catalog process flowchart (register to certify) → Data quality management process flowchart
Data quality and master data
Five templates for keeping shared data fit for use: quality rules and monitoring, one defect from report to closure, master records from request to retirement, the business glossary and the catalog entry they all reference.
5 templates
Data engineering and migration
Four templates for moving data between systems: pipeline development with test, security and quality gates, migration from assessment to cutover, lineage documentation, and the enterprise implementation that calls for both.
7 templates
Digital transformation
How a digital transformation runs as a sequence: business case and funding, portfolio prioritization, project governance, enterprise software implementation, data migration and user acceptance testing.
19 templates
Digital Transformation Process Flowchart → Digital Initiative Prioritization Process → Project Governance Process Flowchart → Enterprise Software Implementation Process
Gantt charts
Fifteen editable Gantt chart templates for software, construction, events, launches, research and more. Each has tasks, dependencies and milestones, and the dates follow when you change a duration.
83 templates
Project delivery
Nine templates for running a project under control: governance from charter to closure, change requests, the risk register and escalation tree, go/no-go decisions, formal closure, and two full-lifecycle delivery SOPs.
24 templates
Operations & maintenance
Maintenance
Five maintenance templates from work order to failure investigation: work order, preventive and corrective maintenance, the equipment maintenance cycle and RCFA, plus predictive, breakdown, troubleshooting, calibration and shutdown charts.
13 templates
Maintenance work order process flowchart (request to close-out) → Preventive maintenance process flowchart (scheduled PM) → Corrective maintenance process flowchart (planned repair of a known defect) → Equipment maintenance process flowchart
Asset lifecycle
Three templates for an asset's life from installation to retirement: commissioning and handover, the maintenance cycle, and decommissioning, plus equipment qualification, laboratory retirement and two commissioning SOPs.
7 templates
Equipment commissioning process flowchart (installation to handover) → Equipment maintenance process flowchart → Equipment decommissioning process flowchart (asset retirement)
Permit to work
Sixteen safety templates around the permit to work: contractor induction, toolbox talk, the permit itself, gas testing and stop work authority, plus hot work, confined space, height and excavation permits and four isolation charts.
16 templates
Contractor safety induction process flowchart (site access) → Toolbox talk process flowchart (daily pre-task safety briefing) → Permit to work process flowchart (issue, suspend, hand back) → Gas testing process flowchart (permit-to-work atmospheric testing)
Safety incidents
Three templates for the health and safety reporting loop: near miss reporting, workplace incident reporting with statutory notification, and investigation to verified controls, plus the emergency decision tree and two inspection rounds.
7 templates
Near miss reporting process flowchart (close calls and high potential) → Workplace incident reporting process flowchart (health and safety) → Safety incident investigation process flowchart (scene to controls)
Industry-specific
Ship repair
The ship-repair job as six linked yard SOPs: vessel arrival and docking, dry docking, project kickoff, subcontractor onboarding, repair quality inspection and handover, with the permits, emergency line and change order alongside.
10 templates
Vessel arrival and docking SOP (ship-repair yard) → Dry docking and undocking SOP: block plan to refloat → Ship repair project kickoff SOP: specification to work packages → Shipyard subcontractor onboarding SOP: induction to checkout
Instrumentation services
The instrumentation provider's chain as four SOPs: instrument selection, installation and commissioning, calibration and documentation, and calibration planning, plus dispatch, out-of-tolerance, emergency, shutdown and ATEX work.
10 templates
New Instrument Selection & Specification SOP → Process Instrument Installation & Commissioning SOP → Instrument Calibration & Documentation SOP → Preventive Maintenance & Calibration Planning SOP
Marine electrical
The marine and offshore electrical job as four SOPs: offshore project mobilization, marine electrical installation, inspection and testing, and system commissioning, plus the turnkey, emergency, high-voltage, ATEX and design-change SOPs.
10 templates
Offshore / Wind Project Mobilization SOP → Marine Electrical Installation SOP → Electrical Inspection & Testing SOP → Electrical System Commissioning SOP
Food production
The food production run as six linked flowcharts: line changeover, cleaning-in-place, the shift production workflow, batch production, food quality control and product release, with the plant overview and equipment maintenance alongside.
8 templates
Production line changeover process flowchart (allergen check to QA release) → Cleaning-in-place (CIP) process flowchart (pre-rinse to final release) → Food production workflow flowchart (shift production floor cadence) → Batch production process flowchart (batch record to warehouse handoff)
HACCP food safety
The HACCP system as four linked flowcharts: the plan that produces the CCPs, CCP monitoring at the line, the CCP deviation response and nonconforming food product disposition, with allergen, label and temperature controls alongside.
7 templates
HACCP process flowchart (7-principle food safety plan) → CCP monitoring process flowchart (reading, recording and deviation handoff) → CCP deviation process flowchart (critical limit exceedance response) → Nonconforming food product process flowchart (food-safety disposition and CAPA)
Food supply and traceability
The food supply chain's identity trail as four linked flowcharts: food supplier approval, incoming raw material inspection, lot traceability and product recall, with the customer complaint process that most often triggers a trace alongside.
5 templates
Food supplier approval process flowchart (documentation to approved list) → Incoming raw material inspection flowchart (receiving to release or hold) → Food traceability process flowchart (lot receipt to trace record) → Food product recall process flowchart (safety-driven recall, not withdrawal)
Custom furniture orders
The custom furniture order's front half as six linked flowcharts: specification review, design approval, sample approval, BOM management, quotation and engineering-to-production handoff, plus the order overview and design change approval.
9 templates
Customer specification review process flowchart → Custom furniture design approval process flowchart → Customer sample approval process flowchart (furniture) → Bill of materials (BOM) management process flowchart
Furniture production planning
Production planning and control in a furniture plant as five linked flowcharts: production planning, scheduling, the work order, line changeover and the shop-floor workflow, with the end-to-end furniture manufacturing overview alongside.
6 templates
Furniture production planning process flowchart → Production scheduling process flowchart (furniture manufacturing) → Furniture production work order process flowchart → Furniture production line changeover process flowchart
Woodworking
Casegoods fabrication as nine linked flowcharts: timber receiving, moisture inspection, lumber selection, cutting, CNC machining, drilling and routing, sanding, assembly and finishing, with edge banding, veneer and wood finishing alongside.
12 templates
Timber receiving and inspection process flowchart → Wood moisture inspection process flowchart → Lumber selection and grading process flowchart → Wood cutting process flowchart
Upholstery
Upholstered furniture fabrication as five linked flowcharts: fabric receiving and inspection, fabric cutting, frame assembly, the upholstery step and final upholstery inspection, plus foam cutting and the upholstered furniture overview.
7 templates
Fabric receiving and inspection process flowchart → Fabric cutting process flowchart → Furniture frame assembly process flowchart (upholstery frames) → Upholstery process flowchart (padding to trim)
Furniture quality
Quality in a furniture plant as eight flowcharts: the quality control overview, incoming material inspection, in-process and final inspection, rework, nonconforming product, defect management and the customer quality complaint.
8 templates
Furniture supply chain
Materials into a furniture plant as six linked flowcharts: supplier qualification, raw material procurement, receiving, incoming inspection, raw material inventory and replenishment, plus timber procurement and component outsourcing.
8 templates
Supplier qualification process flowchart (furniture materials) → Furniture raw material procurement process flowchart → Material receiving process flowchart (furniture manufacturing) → Incoming material inspection process flowchart
Furniture delivery
Finished furniture out of the plant as six linked flowcharts: packaging, the finished goods warehouse, picking and dispatch, loading, delivery and on-site installation, plus delivery damage handling and the furniture return process.
8 templates
Furniture packaging process flowchart → Finished furniture warehouse process flowchart → Furniture picking and dispatch process flowchart → Furniture packaging and loading process flowchart (dispatch logistics)
Furniture equipment maintenance
Keeping a furniture plant's machines running as seven flowcharts: preventive maintenance, woodworking and CNC machine maintenance, breakdown response, cutting tool replacement, dust extraction inspection and equipment lockout/tagout.
7 templates
Patient journey
The patient's path through care as six linked flowcharts: patient referral, intake, prior authorization, the telehealth visit, medication reconciliation and discharge planning, each keeping clinical judgement with a qualified clinician.
6 templates
Patient referral process flowchart (send, triage and close the loop) → Patient intake process flowchart (request to clinical handoff) → Prior authorization process flowchart (request, denial and appeal) → Telehealth visit workflow flowchart
Healthcare safety and compliance
The event-driven and assurance processes around care as five flowcharts: adverse event reporting, HIPAA breach notification, clinical trial protocol deviation, provider credentialing and the medical device complaint.
5 templates
Policy lifecycle
Editable policy lifecycle process templates for insurer, broker and operations teams. Move an accepted quote through underwriting, issue, servicing and renewal while keeping the policy state and effective dates consistent.
10 templates
Insurance Quote Process flowchart template → Insurance Application Process flowchart template → Insurance Underwriting Process flowchart template → Insurance Policy Issuance Process flowchart template
Policy administration
Editable policy administration process templates for insurer, broker and operations teams. Handle policy changes, corrections and cancellations with a checked effective date and a controlled policy record.
4 templates
Claims
Editable claims process templates for insurer, broker and operations teams. Follow a reported loss from first notice through a registered file, document collection, assessment and settlement.
8 templates
First Notice of Loss (FNOL) Process flowchart template → Claim Documentation Process flowchart template → Claim Assessment Process flowchart template → Claim Settlement Process flowchart template
Contract administration
The contract-administration chain on a building project: the RFI that exposes a gap, the change order that prices it, the progress payment that pays it, and the extension of time claim that protects the programme.
4 templates
RFI process flowchart (construction request for information) → Construction change order process flowchart (notice to payment) → Construction progress payment process flowchart (pay application)
Approvals, inspection & closeout
The quality path of a building project: submittal review before purchase, building permit approvals, inspection hold points during the work, and the punch list that closes it out.
4 templates
Construction submittal review process flowchart → Construction inspection and hold point process flowchart (ITP) → Construction punch list process flowchart (completion to close-out)
Student lifecycle
Editable student lifecycle flowcharts: admissions decisions and waitlists, enrollment and fee clearance, learning support plans, and withdrawal with refunds and clearances.
4 templates
Student admissions process flowchart → Student enrollment process flowchart → Student withdrawal process flowchart
Laboratory
Sample lifecycle
The laboratory sample lifecycle as eight linked flowcharts: collection, transport, receipt, log-in, labelling, storage, retention and disposal, with chain of custody, rejection, aliquoting, inventory and stability pulls alongside.
15 templates
Sample collection process flowchart → Sample transport process flowchart → Sample receipt process flowchart → Sample log-in process flowchart
Laboratory testing
Fourteen laboratory testing flowcharts: the worklist, sample preparation, analytical testing and method execution chain, the chromatography, dissolution, microbiological and purpose-specific variants, and the in-run QC controls.
14 templates
Laboratory worklist process flowchart → Sample preparation process flowchart → Analytical testing process flowchart → Test method execution process flowchart
Laboratory data review
Seven laboratory data review flowcharts: data review, notebook review, report approval and Certificate of Analysis in sequence, with chromatographic data review, data integrity review and laboratory document control alongside.
7 templates
Laboratory data review process flowchart → Laboratory notebook review process flowchart → Laboratory report approval process flowchart → Certificate of Analysis (CoA) process flowchart
Laboratory investigations
Laboratory investigation flowcharts in sequence: quality event triage, OOS investigation, root cause analysis, laboratory CAPA, effectiveness check and investigation closure, plus deviation, nonconformance, incident and escalation routes.
11 templates
Quality event triage process flowchart → Out-of-specification (OOS) investigation process → Laboratory root cause analysis process flowchart → Laboratory CAPA process flowchart
Analytical method lifecycle
The analytical method lifecycle as six linked flowcharts: method development, validation protocol, validation, verification, method transfer and method change control, with the periodic lifecycle review alongside.
7 templates
Analytical method development process flowchart → Method validation protocol process flowchart → Analytical method validation process flowchart → Analytical method verification process flowchart
Laboratory equipment
Laboratory equipment lifecycle flowcharts in sequence: qualification, inventory, status labelling, use log, cleaning, maintenance, calibration and retirement, with the breakdown and return-to-service pair alongside.
10 templates
Equipment qualification process flowchart → Laboratory equipment inventory process flowchart → Equipment status labeling process flowchart → Equipment use log process flowchart
Reagents and standards
Reagent management flowcharts in sequence: qualification, receipt, labelling, inventory, preparation, expiry management and disposal, with the reagent management overview and the reference standard qualification and management pair.
10 templates
Reagent qualification process flowchart → Reagent receipt process flowchart → Reagent labeling process flowchart → Reagent inventory process flowchart
Environmental monitoring
Environmental monitoring flowcharts in sequence: routine monitoring, trend review and excursion handling, with cleanroom monitoring, laboratory water monitoring and the temperature and humidity excursion templates alongside.
7 templates
Environmental monitoring process flowchart → Environmental monitoring trend review process flowchart → Environmental monitoring excursion process flowchart
Analyst training
Laboratory analyst training flowcharts in sequence: training, qualification, competency assessment, authorisation and the training record, with the training gap template for when the evidence falls short.
6 templates
Laboratory analyst training process flowchart → Laboratory analyst qualification process flowchart → Analyst competency assessment process flowchart → Analyst authorization process flowchart
Laboratory safety
Six laboratory safety flowcharts: the preventive chain of risk assessment, PPE management and waste management, and the reactive routes for spill response, emergency response and safety incident reporting.
6 templates
Laboratory risk assessment process flowchart → Laboratory PPE management process flowchart → Laboratory waste management process flowchart
Outsourced testing
Contract laboratory flowcharts in sequence: the outsourcing decision, contract laboratory qualification, sample transfer, external result review and performance review, plus the external laboratory deviation route.
6 templates
Laboratory outsourcing process flowchart → Contract laboratory qualification process flowchart → Sample transfer to contract laboratory process flowchart → External laboratory result review process flowchart