Spreadsheet to flowchart
Worked Excel, CSV and Google Sheets flowchart examples with downloadable rows, editable charts, column guidance and practical import steps.
All pages
- Excel to Flowchart: Sample Spreadsheet and Editable Process Map — Prepare Excel rows with Shape, Box text and Line to columns, then paste or import them into QueryChart. Try the editable example with decisions and owner lanes.
- CSV to flowchart: the three columns that draw the diagram — Drop a .csv onto QueryChart's spreadsheet and it draws. Shape, Box text and Line to are the three columns that make a flowchart; the lane and label columns refine it. Import matches header names, not column order.
- Google Sheets to flowchart: convert Google Sheets to audit-ready process maps — Use a worked spreadsheet flowchart to plan rows, connections and owner lanes. Paste or import the prepared steps into QueryChart, then pull linked Google Sheets values into chart columns when needed.
- Spreadsheet to process map: the audit-ready, deterministic conversion — See a tender-response spreadsheet turned into an editable process map, with five owner lanes, a deadline check and explicit review loops. Adapt its row structure to your own process.
- CSV flowchart generator: drop a file in, get a flowchart out — A browser-based CSV flowchart generator. Drop a .csv onto the spreadsheet and the rows draw as shapes. Generation is mechanical rather than generative: the same file always draws the same chart.
- CSV to process map: stages and owners from your export columns — Turn a CSV export into a process map. Your stage column becomes Horizontal lane, your owner column becomes Vertical lane, and Line to draws the arrows by row number.
- CSV to diagram: the same columns draw a flowchart, swimlane or hierarchy — Shape, Box text and Line to are the three columns that draw a diagram. Add the lane columns and the same rows become a swimlane; change the rows and they become a process map, a hierarchy, a decision tree or a journey map.
- CSV workflow generator: turn an exported workflow definition into a diagram — Turn a workflow definition exported to CSV into a diagram with approval gates and rework loops. Three columns draw it: Shape, Box text and Line to. QueryChart documents the workflow; it does not execute it.