Emergency treatment of anaphylaxis (adult UK pathway)

A source-linked educational visual of adult anaphylaxis recognition, intramuscular adrenaline, resuscitation and observation based on RCUK guidance.

Important safety note

This visual algorithm is an educational representation of published UK clinical guidance and is not a substitute for clinical judgement, local protocols, senior/specialist advice, or the original guideline. Verify current guidance before clinical use.

Scope and source

Scope
Adults with suspected anaphylaxis in UK emergency and acute-care services.
Jurisdiction
UK
Primary guidance
Resuscitation Council UK: Emergency treatment of anaphylactic reactions
Guidance last updated
2021-05-01
Clinical reference reviewed
2026-09-08
Review due
2027-03-08

Interactive clinical algorithm

This source-backed visual algorithm is available in the interactive page experience. Open the original guidance and the node notes before clinical use.

How to read this visual

  • Read across the columns for the phases of the pathway; the swimlanes are who acts — Emergency team, Monitoring and IV access, Critical care and specialist input.
  • Bold marks the dose, threshold or time limit that decides the next step; the rest of a label is context.
  • Treat airway, breathing or circulation problems as anaphylaxis when the clinical context supports it.
  • Open node notes for repeat treatment, refractory symptoms and observation qualifications.

Clinical notes

  • Do not delay intramuscular adrenaline for antihistamines or corticosteroids.
  • Use local paediatric, obstetric and peri-operative pathways where those populations or contexts apply.

Sources

Open an editable reference copy

Create a personal educational copy. Verify the original guidance before clinical use.

Open an editable reference copy

More in Emergency medicine clinical algorithms

Browse all Emergency medicine clinical algorithms