Marketing campaign Gantt chart template: brief to report

An editable marketing campaign Gantt chart: strategy, content production, creative review, launch, distribution, optimisation and reporting, with milestones and dependencies.

Use this template

What the marketing campaign gantt chart template: brief to report process is

Campaigns are scheduled backwards from a start date and then fail at the middle, in review. Copy, design and video are made by different people, they arrive at different times, and review cannot start until all of it exists. A Gantt chart shows that join before it happens, and shows how much slack the creative work has before launch.

This template has four phases: Strategy, Production, Review and Run. Copywriting, design and video start together once the budget is approved and meet at "Creative review". The landing page depends on the copy only, so it can be built while design and video are still in progress. Legal and brand sign-off sits between review and launch because it is the step that is skipped under pressure and costs the most when missed.

Once the campaign is running, "Distribution and posting" and "Optimisation" run side by side, with optimisation starting three days in, long enough to have data to look at. The "Final report" waits for both. The plan carries no fixed dates; if the campaign has to start on a given day, pin "Campaign launch" to it and read what is late.

If your marketing work is a recurring calendar rather than a one-off campaign, see the content calendar plan at /templates/content-calendar-gantt-chart.

What this flowchart covers

In this template

  • Four phases, Strategy, Production, Review and Run, with 14 tasks and three milestones: "Budget approved", "Ready to launch" and "Campaign launch".
  • Three production streams, "Copywriting", "Design and creative" and "Video production", that all start after "Budget approved" and meet at "Creative review".
  • A landing page that waits only for copy: "Landing page build" depends on "Copywriting", not on design or video.
  • A compliance gate: "Legal and brand check" sits between "Creative review" and "Ready to launch".
  • Optimisation that starts during the run: "Optimisation" begins three days after launch and the "Final report" waits for it and for "Distribution and posting".

When to use this template

  • You are planning a campaign with several people producing assets and need the review date to be realistic.
  • A launch date is fixed and you want to see how late the creative can be.
  • Approvals keep arriving at the last minute and you want them in the plan.
  • You report campaign results and want a standard frame from brief to report.

The plan, task by task

Every task in the chart with its length in working days and what it waits for. A dependency is a step number; SS is start-to-start, FF is finish-to-finish, and +n is a lag in working days.

#TaskGroupWorking daysDepends on
1Campaign briefStrategy3
2Audience and channel planStrategy41
3Budget approvedStrategyMilestone2
4CopywritingProduction83
5Design and creativeProduction103
6Video productionProduction123
7Landing page buildProduction64
8Creative reviewReview34, 5, 6
9Legal and brand checkReview28
10Ready to launchReviewMilestone7, 9
11Campaign launchRunMilestone10
12Distribution and postingRun1511
13OptimisationRun1511SS+3
14Final reportRun412, 13

How it works

  1. Write the brief as the first task

    Keep the brief and the channel plan as tasks with owners. The budget milestone then marks the point where production can begin.

  2. Give each asset type its own task

    Separate copy, design and video so the schedule shows which one holds up review. Merge them only when one person does all three.

  3. Link the landing page to what it needs

    Make the page depend on the copy, not on every asset, so it can be built early.

  4. Keep legal and brand review in the plan

    Estimate its length from the last campaign, not from hope. It is the step most often compressed.

  5. Overlap the run

    Start optimisation a few days after launch with a start-to-start link and a lag, not after distribution ends.

  6. Book the report

    Keep the final report as a task. Without a date, results are collected late or never.

Frequently asked questions

How do I make a marketing campaign timeline?

List the phases from brief to report, give every task a length in working days and say which tasks it waits for. This template does so for a generic campaign. Edit the tasks and the dates are calculated.

Is this a content calendar?

No. This plans a single campaign from brief to report. A content calendar schedules a stream of recurring posts; see the content calendar template for that.

What are the milestones in a campaign plan?

Budget approved, ready to launch and campaign launch. Each is a decision or a hand-off with no work of its own.

Can the dates be tied to a launch day?

Yes. Pin the launch task to a date. The schedule is still calculated forward from the start: if the work before it needs longer than there is, the launch task is flagged with the earliest date its dependencies allow, which tells you what to shorten or overlap.

Part of

QueryChart features for this process

Use this template

More in Project management process templates

Browse all Project management process templates

Marketing campaign Gantt chart: Strategy → Production → Review → Run
Marketing campaign Gantt chart template: brief to report