SOP templates by industry

Standard operating procedure templates grouped by industry: ship repair, instrumentation and calibration, electrical and marine. Free to open and edit.

Ship-repair yard

  • Vessel arrival and docking SOP (ship-repair yard)

    A vessel arrival and docking SOP for a ship-repair yard: pre-arrival berth checks, pilot and tug booking, the weather and tidal go or hold decision, pilotage, mooring, and a signed handover to the project team.

  • Dry docking and undocking SOP: block plan to refloat

    A shipyard SOP for dry docking and undocking a vessel: block plan verification, controlled dewatering, a stability check, dry-period repair work, and refloat, with an owner and workload hours on every step.

  • Ship repair project kickoff SOP: specification to work packages

    A ship repair project kickoff SOP: specification intake, mechanical/electrical/hydraulic review, PM assignment, work-package breakdown, subcontractor gap-fill, scheduling, and a confirm/revise kickoff before work reaches the workshops.

  • Hot work permit SOP: gas test, fire watch, and closure

    A hot work permit SOP for ship repair: gas-test the atmosphere, assign a fire watch, get dock master and HSE sign-off, then hold a mandatory post-work watch before the permit closes.

  • Confined space entry SOP for ship repair yards

    A confined space entry SOP for ship-repair yards: risk assessment, isolation and ventilation, atmosphere testing, permit issue, standby and rescue readiness, entry, and permit closeout.

  • Shipboard repair quality inspection SOP

    A shipboard repair quality inspection SOP for ship-repair yards: technician self-check, independent QA/QC inspection, conditional NDT verification, class surveyor sign-off, and customer acceptance before the record is filed and closed out.

  • Emergency repair request SOP (24/7 triage to release)

    How a ship-repair yard turns a defect reported on the 24/7 duty line into a triaged, quoted or mobilized repair: urgency triage, customer approval, mechanical/electrical/hydraulic mobilization, function test and vessel release.

  • Change order approval SOP for a ship repair yard

    A change order approval SOP for ship repair: a mid-repair finding is assessed against original scope, estimated, submitted to the customer for approval, executed, QA/QC inspected, and filed on closeout.

  • Shipyard subcontractor onboarding SOP: induction to checkout

    A shipyard subcontractor onboarding SOP for ship repair yards: document and insurance verification, a pass/fail safety induction, access and PPE issue, a hot work or confined space permit decision, supervised work and checkout.

  • Vessel repair handover SOP: completion review to departure

    A shipyard SOP for vessel repair completion and handover: outstanding-item review, testing and commissioning, QA documentation, customer and class inspection, punch-list closure, and undocking, with an owner and workload hours per step.

Instrumentation & calibration

  • Instrument Calibration & Documentation SOP

    Insatech's core calibration SOP: verify traceable reference equipment, record as-found readings before adjustment and as-left readings after, then issue a certificate an auditor can follow end to end.

  • Out-of-Tolerance Calibration SOP

    An out-of-tolerance calibration SOP for Insatech: assessing how far and which way an instrument drifted, determining what it affected, notifying the customer before touching it, then correcting and recalibrating.

  • On-Site Service Request & Dispatch SOP

    An on-site service request and dispatch SOP for Insatech: ServiceDesk intake and triage, the remote-versus-on-site decision, technician assignment, equipment preparation, the customer visit and the service report that closes every case.

  • Emergency instrument troubleshooting SOP (instrumentation service provider)

    An emergency instrument troubleshooting SOP: gathering process data on a fault that isn't yet named, diagnosing which instrument is implicated, weighing safety and production urgency, then choosing a remote fix or field dispatch.

  • New Instrument Selection & Specification SOP

    A new instrument selection and specification SOP: understanding process conditions, choosing the right measurement principle, checking compliance, and a customer technical-approval gate before any instrument is quoted or ordered.

  • Process Instrument Installation & Commissioning SOP

    An instrument installation and commissioning SOP: equipment verification, safety preparation, installation, electrical and mechanical checks, configuration, loop testing, calibration and a signed customer handover.

  • Preventive Maintenance & Calibration Planning SOP

    A preventive maintenance and calibration planning SOP for instruments under a service agreement: criticality assessment, interval determination, scheduled maintenance, drift-trend analysis and evidence-based interval adjustment.

  • Turnaround / plant shutdown service SOP

    A turnaround and plant shutdown service SOP for instrumentation: scope and resource the shutdown window with the customer, coordinate safety, isolate, calibrate, repair and certify every covered instrument before the final report.

  • ATEX Instrument Selection & Installation SOP

    An ATEX instrument selection and installation SOP for classified hazardous areas: zone classification, a hard ATEX marking-verification gate, technical review, hazardous-area installation requirements, inspection and commissioning.

  • Customer Project Delivery SOP: Instrumentation & Automation Solution

    A customer project delivery SOP for a full instrumentation and automation solution: engineering, instrument selection, customer approval, procurement, FAT, installation, commissioning, documentation and operator training.

Electrical, marine & offshore

  • Marine Electrical Installation SOP

    A marine electrical installation SOP for Scanel: engineering review, material verification, work preparation, hands-on installation, a workmanship inspection gate, de-energized checks, documentation and handover to commissioning.

  • Electrical System Commissioning SOP

    An electrical system commissioning SOP for Scanel: pre-energization inspection and testing, a hard energization-approval gate, functional testing with a fault-resolution loop, a commissioning report and signed customer handover.

  • Emergency Marine Electrical Repair SOP

    An emergency marine electrical repair SOP for Scanel's 24/7 service line: fault triage, an operational and safety impact decision, on-board diagnosis, repair or replacement, load-tested verification, and return to service.

  • High-Voltage Electrical Work SOP

    A high-voltage electrical work SOP for Scanel's strictest, safety-gated jobs: a written isolation plan, a named Authorized Person authorization gate, and a verified de-energization check before anyone touches the system.

  • Electrical Inspection & Testing SOP

    An electrical inspection and testing SOP for Scanel: identifying the installation, defining which tests actually apply, safety preparation, performing the tests, assessing results, and issuing an archived report, with no other job attached.

  • Generator & Electric Motor Maintenance SOP

    A generator and electric motor maintenance SOP for rotating machinery: equipment identification, electrical and mechanical testing, a vibration-analysis judgment call, repair, a test-run gate, and a documented return to service.

  • Electrical Engineering & Design Change SOP

    An electrical engineering and design change SOP for Scanel: technical assessment, system design, drawings and schematics, an engineering review, and a customer-approval gate on the design before installation and commissioning begin.

  • Turnkey Marine Electrical Project SOP

    A turnkey marine electrical project SOP for full-scope work: Scanel owns requirements, planning, engineering, procurement, installation, testing and commissioning through documentation, customer acceptance and closeout.

  • ATEX / EEx Equipment Service SOP

    An ATEX/EEx equipment service SOP for equipment already installed in a classified hazardous area: certification verification, isolation, inspection, service or repair, and a hard compliance re-verification gate before return to operation.

  • Offshore / Wind Project Mobilization SOP

    An offshore and wind project mobilization SOP for Scanel: a hard GWO and offshore safety certification gate, equipment and travel logistics, site safety induction, work execution and a demobilization test-result gate.

SOP templates

Controlled standard operating procedure (SOP) templates: approval-tracked, version-controlled, audit-ready. Replace your Word-document SOP library with a controlled platform.

Browse all Process flowchart templates

UK emergency medicine clinical algorithms

Source-linked educational visual algorithms for adult emergency medicine, built from current UK clinical guidance and designed for reference, not protocol substitution.

Browse all UK emergency medicine clinical algorithms