Secondary School Organizational Chart
This editable chart shows one way a secondary school can run subject faculties and year-group pastoral care as two parallel lines under a Headteacher.
Secondary School Organizational Chart
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
A secondary school has to answer two questions about every teacher. Which subject do they teach, and which group of pupils do they look after. Most schools answer both at once, so one person can sit in a faculty and also act as a form tutor in a year group.
This chart is an illustrative, role-based example and not a prescribed structure. It does not describe a particular school and every title can be renamed, including Headteacher, which some systems call Principal.
A tree can show one reporting line per box, so the two lines are drawn side by side under the Headteacher. The faculty line sits under one deputy and the pastoral line under another. A teacher who works in both is drawn once and the shared work is described in the notes.
How a secondary school is organized
The Headteacher has three roles directly below. Deputy Head Teaching and Learning, Deputy Head Pupil Support and School Business Manager each hold one side of the school.
The faculty line runs through five heads. Head of English and Languages Faculty, Head of Mathematics Faculty, Head of Science Faculty, Head of Humanities Faculty and Head of Creative and Practical Faculty each lead the teachers of their subjects. Science Teachers and Technicians are drawn together because the laboratory work is shared.
The pastoral line runs through Head of Lower School and Head of Upper School, each with Form Tutors beneath. Special Educational Needs Coordinator and the Learning Support Team sit in the same line, so a tutor with a concern about a pupil has one deputy to go to. A large school may split the year groups further and add heads for each.
Lead role
Headteacher
Example top role — Replace this title with whoever leads the school, such as Principal.
Deputy Head Teaching and Learning
Example function lead — Owns the faculties, the timetable and the quality of lessons.
Deputy Head Pupil Support
Example function lead — Owns year groups, tutors and support for pupils who need extra help.
How to adapt this structure
The two lines make it clear who answers for lessons and who answers for the pupil. A parent with a worry about behaviour in one subject can be sent to the right person.
Splitting the business side from teaching keeps timetables, budgets and buildings from competing with either deputy for time.
Because the chart is editable, a school can add sixth form, assistant heads or a head of each year group, and merge faculties where the school is small.
Design tradeoffs
- Faculty heads own the quality of a whole subject.
- A pupil is taught by several faculties, so the Head of Lower School depends on information from five heads.
- Form tutors stay with a year group and know the pupils well.
- Tutors report through the pastoral line but teach in a faculty, so their time is shared between two heads.
- The business role frees both deputies from running the site.
- The School Business Manager needs a place in leadership meetings or decisions arrive late.
What this chart shows
- The chart has one Headteacher at the top and three roles directly below.
- Five faculty heads sit under one deputy, which is the widest line in the chart.
- Form tutors sit three levels below the Headteacher, the same depth as faculty teachers.
- Special Educational Needs Coordinator is placed in the pastoral line, but many schools place the role beside the Headteacher instead.
Related process templates
Frequently asked questions
Why are there two lines under the Headteacher?
Secondary schools organize by subject and by year group. The chart shows each as its own line so the question of who answers for what has a visible answer.
Can a teacher belong to a faculty and a year group?
Yes. Draw the teacher once in the line where they report and note the second duty in the role description. Most teachers are in a faculty and also tutor a form.
How does this chart relate to the school process maps?
Admissions and enrollment run through the Office and Administration Team while Head of Lower School handles the arrival of new pupils. Withdrawal and trip approvals pass through the pastoral line. Open the linked flowcharts to see each one.
Is this the structure a secondary school must use?
No. It is an illustrative, role-based example. Change the titles and the lines to match how your school works.
Use this org chart template
Open and edit this secondary school org chart in QueryChart.