Film Crew Hierarchy and Chain of Command by Department

A film crew is a set of departments that each answer to a department head, and the department heads answer to the producer and director. This editable chart shows that chain of command with one level of crew under each head.

Film Crew Hierarchy and Chain of Command by Department

Use this template

Illustrative, editable reporting structure. Adapt roles and lines to your organization.

About this department template

A feature film is made by a temporary company that assembles for a shoot and disbands afterwards. Within that company the work is split into departments such as camera, lighting, art, costume, sound and production, and each department has a head who hires the crew below and answers for the department's results.

This chart is an illustrative, role-based example and not a prescribed structure. It follows North American usage first, where the Director of Photography is the head of both the camera and the lighting departments. Where British usage differs it is named in the text. Sizes and titles vary by production, country, union and budget, and a low-budget shoot will combine many of these roles.

It differs from a chart of a single department because it shows the whole set at department-head level with one level of crew below. For a closer look at one department, see the [camera department hierarchy](/org-templates/camera-department-hierarchy).

How a film crew is organized

The Producer is the top role in the chart. Three branches sit directly below: the Director, the Unit Production Manager and the Post-Production Supervisor. The Director leads the creative work on set, the Unit Production Manager runs the budget and the schedule in practice, and the Post-Production Supervisor takes over once filming ends.

Most department heads sit under the Director because they shape what appears on screen. The Director of Photography leads the Camera Operator, the Gaffer and the Key Grip. The Production Designer leads the Art Director, the Set Decorator and the Property Master. The Costume Designer, the Hair and Makeup Department Head, the Production Sound Mixer and the Stunt Coordinator each lead a small team of their own. The First Assistant Director and the Script Supervisor also report to the Director, and the First Assistant Director runs the set day to day.

The Unit Production Manager looks after the practical side. The Production Coordinator keeps the paperwork and the crew moving, the Production Accountant tracks spending and the Location Manager secures and looks after the places where the film is shot. Under the Post-Production Supervisor are the Picture Editor, the Supervising Sound Editor, the Visual Effects Supervisor and the Colorist. Real productions have more lines than a tree can show. The First Assistant Director works closely with the Unit Production Manager on the schedule. In British usage the Gaffer and Key Grip are often hired by the Director of Photography in the same way, though the lighting and grip departments are sometimes drawn as separate heads.

Lead role

  1. Producer

    Example top role — Replace this with whoever carries final responsibility for the film, which may be several producers sharing the work.

  2. Director

    Example creative lead — Leads the creative decisions on set and works with every department head about what the film should look and sound like.

  3. Unit Production Manager

    Example production lead — Turns the budget and the shooting schedule into daily decisions about people, equipment and money.

  4. First Assistant Director

    Example set lead — Runs the set and the call sheet so that each department knows when it is needed.

  5. Director of Photography

    Example department head — Leads how the film is photographed and, in North American usage, guides the lighting and grip departments.

How to adapt this structure

Each department has one head. A question about the lighting plan goes to the Director of Photography and a question about a missing prop goes to the Property Master, so nobody has to guess who decides.

The chart separates the creative line from the production line. The Director shapes the picture while the Unit Production Manager protects the schedule and the budget, and the Producer holds both together.

Post-production is drawn as its own branch. This shows that editing and sound design are planned from the start and do not wait for the last day of filming.

Design tradeoffs

A department head owns the crew below, which keeps hiring and standards in one place.
The Director deals with many direct reports, so the First Assistant Director often has to filter requests on busy days.
The production line is separate from the creative line.
Decisions that affect both, such as an expensive extra setup, need the Director and the Unit Production Manager to talk before the day starts.
One level of crew under each head is easy to read.
Deeper chains such as camera assistants or electricians are not visible until you open a department chart.

What this chart shows

  • The Director of Photography appears under the Director here, but on a real set the two work side by side and share decisions about every shot.
  • The Production Designer leads a department with its own deeper tree of art directors, decorators, buyers and builders, which is why a separate department chart is useful.
  • Post-Production Supervisor sits under the Producer because editing, sound and effects usually start while filming is still under way.
  • The chart has no real names, productions or union rules, since every one of those varies from film to film.

Related process templates

Frequently asked questions

Who is at the top of a film crew hierarchy?

The producer or producers hold final responsibility for the film, including the money and the delivery. The director leads the creative work and the department heads lead their crews. On a small film one person may be both producer and director, and the chart can be redrawn to show that.

What is the difference between a department head and a crew member?

A department head, such as the Director of Photography or the Production Designer, plans the work of a whole department and hires the people below. Crew members carry out that plan in their own specialty. The chart shows one level of crew under each head and leaves deeper levels to a department chart.

Who reports to the director on a film set?

In most productions the First Assistant Director, the Script Supervisor and the creative department heads report to the director for what appears on screen. The Unit Production Manager reports to the producer, though the two roles work closely together on the schedule and cost of each day.

Is the film crew hierarchy the same in every country?

No. Titles, union rules and the grouping of departments vary by country and by production. This chart follows North American usage first and notes British differences. Rename the roles, merge the departments your production does not have and redraw the lines to match your own crew.

Use this org chart template

Open and edit this film crew org chart in QueryChart.

Use this template

More in Company Organizational Charts & Structure Examples

This is an illustrative, role-based organizational chart template. It does not describe any particular production, company or union, and it does not prescribe a required reporting model. Titles, crew sizes and reporting lines vary by production, country, union and budget, so adapt the roles and lines to your own crew.