Lighting and Grip Department Hierarchy: Gaffer and Key Grip Chart

On a film set the Gaffer runs the lighting crew and the Key Grip runs the grips, and both take their direction from the Director of Photography. This editable chart shows who sits under each head, from Best Boy to rigging crew.

Lighting and Grip Department Hierarchy: Gaffer and Key Grip Chart

Use this template

Illustrative, editable reporting structure. Adapt roles and lines to your organization.

About this department template

Lighting and grip are two crews that work side by side on almost every set. The lighting crew places and powers the lamps. The grip crew builds the supports, shapes the light with flags and frames, and moves the camera on dollies and cranes. Both answer to the Director of Photography for the look of the image.

This chart uses US job titles, because that is the larger market and the titles most searched. In US usage the lighting crew is often called the electric department and its head is the Gaffer. In UK usage the Gaffer and the grip crew are named the same way, but grips are often grouped closer to the camera department and a Dolly Grip may be hired as part of the camera team. Treat the chart as an illustrative structure. Sizes and titles vary by production, country, union and budget.

It goes deeper than the full film crew chart. For the whole set at department-head level, see [film crew hierarchy](/org-templates/film-crew-hierarchy). For the camera crew that works next to these two departments, see [camera department hierarchy](/org-templates/camera-department-hierarchy).

How a lighting and grip department is organized

The Director of Photography is the top role in this chart. Two heads sit directly below: the Gaffer for lighting and the Key Grip for grip. The Director of Photography decides what the light should do and the two heads decide how to build it.

Under the Gaffer sits the Best Boy Electric, who is second in command and runs the crew day to day: ordering equipment, hiring day players and keeping the paperwork. The Best Boy Electric leads the Lighting Technicians, who place and plug in the lamps, and the Generator Operator, who keeps power running on location. The Lighting Console Operator runs the board when lamps are dimmed or programmed. The Rigging Gaffer prepares a location ahead of the shooting crew, with Rigging Electrics running cable and hanging lamps.

Under the Key Grip sits the Best Boy Grip, who manages the grip truck and the Grips, and may lead a Swing Gang that covers both lighting and grip work when sets are being built or struck. The Dolly Grip pushes the dolly and lays track, helped by a Second Dolly Grip. The Rigging Key Grip prepares ahead with Rigging Grips. The Crane Operator is drawn under the Key Grip because large camera cranes are grip equipment.

A tree has one parent per box, so the chart shows each person once. In practice the Unit Production Manager sets budgets for both departments, the First Assistant Director schedules their time and the Gaffer and Key Grip often agree placements directly with each other. Add those lines in notes on your own chart if they matter to you.

Lead role

  1. Director of Photography

    Example top role — Sets the lighting plan and tells the Gaffer and Key Grip what the image needs.

  2. Gaffer

    Example department head — Chief lighting technician. Turns the lighting plan into lamps, power and a crew to place them.

  3. Key Grip

    Example department head — Leads the grip crew. Owns support, shaping of light with flags and frames, and camera movement equipment.

  4. Best Boy Electric

    Example second in command — Runs the electric crew day to day, orders equipment and hires day players.

  5. Best Boy Grip

    Example second in command — Runs the grip truck and the grip crew, and handles orders and hires.

  6. Dolly Grip

    Example specialist — Moves the dolly smoothly on cue so camera moves stay repeatable.

How to adapt this structure

Two heads share one set. The Gaffer owns what makes light and the Key Grip owns what holds and shapes it, so there is rarely doubt about who to ask for a flag, a rig or a circuit.

Each head has a second in command. A Best Boy lets the head stay on set with the Director of Photography while someone else orders, hires and counts equipment.

Rigging crews work ahead of the shooting crew. Drawing them as their own boxes shows that preparation is part of the structure and does not depend on whoever is free.

Design tradeoffs

Lighting and grip heads can be briefed by the Director of Photography in one conversation.
The two departments depend on each other for placement, so a late change in one crew moves the other.
Rigging crews keep the shooting crew free to shoot.
Rigging needs its own budget and its own days, which a small production may not be able to afford.
A Dolly Grip is a clear named owner of camera movement.
Some productions place the Dolly Grip with the camera crew, so check how your own set splits this.

What this chart shows

  • The Director of Photography is the only role above both heads, so the chart stays four levels deep.
  • Swing Gang is a grouping box. It stands for crew who swing between lighting and grip work, and it may not exist on a small shoot.
  • Crane Operator sits under the Key Grip because large cranes and arms are treated as grip equipment on many sets.
  • Gaffer and Best Boy are job titles that spread from English-language film sets, and the same crew may be named differently in other countries.

Frequently asked questions

What is the difference between a Gaffer and a Key Grip?

The Gaffer is the chief lighting technician and leads the crew that places and powers lamps. The Key Grip leads the crew that builds supports, shapes light with flags and frames, and moves the camera on dollies and cranes. Both work for the Director of Photography.

What does a Best Boy do on a film set?

A Best Boy is the second in command of a department. The Best Boy Electric assists the Gaffer and the Best Boy Grip assists the Key Grip. They order equipment, hire day crew, keep records and run the crew day to day, so the head can stay on set.

Who does the Gaffer report to?

On most productions the Gaffer reports to the Director of Photography for creative direction. Budget and hiring questions go to the production office, usually through the Unit Production Manager. Reporting varies by production, country and union, so adjust the chart to your own set.

What does a Dolly Grip do?

A Dolly Grip lays track or levels the floor and pushes the dolly during a take so the camera moves smoothly and the same way each time. A Second Dolly Grip helps with track, wedges and moves. Some sets place the Dolly Grip with the camera team.

Is this the structure every film set must use?

No. It is an illustrative, role-based example. Smaller productions merge roles and larger ones add more. Rename the boxes and redraw the lines to match your own lighting and grip crew.

Use this org chart template

Open and edit this lighting and grip department org chart in QueryChart.

Use this template

More in Company Organizational Charts & Structure Examples

This is an illustrative, role-based organizational chart template. It does not describe any particular production, company or union, prescribe a required reporting model or establish approval authority. Sizes and titles vary by production, country, union and budget. Adapt roles, hierarchy and cross-functional notes to your own set.