Orchestra Hierarchy Chart: Sections, Principals and Staff
An orchestra hierarchy runs from the music director through the concertmaster (called the leader in the UK) and the section principals to the section players. This chart also shows the orchestra manager, librarian and stage team that keep rehearsals and concerts running.
Orchestra Hierarchy Chart: Sections, Principals and Staff
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
An orchestra looks like one body from the audience and works like several small teams. Each instrument family has a principal who leads the section, and the section players follow that lead while the conductor shapes the whole sound. Behind the stage a separate group handles contracts, music and the stage.
This chart is an illustrative, role-based example and not a prescribed structure. Sizes and titles vary by orchestra, country, union and budget, and it does not describe any particular ensemble.
It differs from the other performing arts charts in this set because it covers the whole orchestra at section level, with principals and section players, and does not go deep into a single team.
How an orchestra is organized
The Music director is the top role in the chart. The wind, brass and timpani principals and the Concertmaster (Leader in the UK) sit below, together with the Assistant conductor and the Orchestra manager. The Music director sets the artistic direction, chooses the programme with the administration and conducts the main concerts. In many orchestras the administrative team reports to an executive director or a board, so the line from the Music director to the Orchestra manager shows coordination and not a full reporting line.
The strings are drawn under the Concertmaster, who leads the first violins, tunes the orchestra and works as the link between the players and the conductor. Each other string section has a Principal, such as the Principal viola, with the section players below. The winds, brass and percussion follow the same pattern. A Principal flute, oboe, clarinet or bassoon leads the woodwind players, and the horn, trumpet, trombone and timpani principals lead their own groups. Principals share decisions on bowings, entries and balance within their section.
Orchestra manager is the administrative branch. The Personnel manager (called the orchestra personnel manager in some places) books players and substitutes, the Orchestra librarian prepares and marks the parts, and the Stage manager and Stage crew set the platform, chairs and stands. Smaller orchestras combine these jobs, and a large one adds assistant principals and a separate operations team.
Lead role
Music director
Example top role — Replace this title with the artistic leader of your ensemble, such as a chief conductor or artistic director.
Concertmaster (Leader in the UK)
Example string leader — Leads the first violins and acts as the link between the conductor and the players.
Principal oboe
Example section principal — Leads the oboe players and gives the tuning note. Swap in the principal of any other section.
Orchestra manager
Example administration lead — Looks after the schedule, contracts and the day to day running of rehearsals and concerts.
Orchestra librarian
Example support role — Prepares, marks and returns the music for every player.
How to adapt this structure
Every player has a clear leader. A violist asks the Principal viola about a bowing and does not need to ask the conductor, which keeps rehearsals moving.
The Concertmaster is placed apart from the other principals because the role bridges the section and the podium.
The administrative branch is separated from the artistic branch, so the chart shows who handles the schedule and the music while the Music director works on the sound.
Design tradeoffs
- Section principals settle small questions inside the section.
- Players in different sections may hear different instructions unless the principals talk to each other.
- The Concertmaster gives the conductor a single player contact.
- A single contact can become a bottleneck when the Concertmaster is also leading a section.
- Administration has its own branch.
- Showing it under the Music director can hide the fact that the manager answers to a board or executive director.
What this chart shows
- Principals are the only second-level roles other than the Concertmaster, the Assistant conductor and the Orchestra manager, which keeps the chart two tiers deep for most players.
- Section players are drawn as a group box, so one box stands for every player in that section.
- The Concertmaster title is used in the US and the leader title in the UK. The chart shows the US term first and the UK term once.
- Many orchestras rotate players within a section, so a section box is a role and does not name individuals.
Frequently asked questions
Who is at the top of an orchestra hierarchy?
Usually the music director, who sets artistic direction and conducts the main concerts. Many orchestras also have an executive director over the administration. This chart draws the music director at the top and notes the administrative line in the text.
What is the difference between a concertmaster and a leader?
They are the same job under two names. Concertmaster is the US term and leader is the UK term. The person sits first chair of the first violins, tunes the orchestra and works as the link between the players and the conductor.
What does a section principal do?
A principal leads one instrument section. They play the solos for that section, agree bowings or breathing marks with their players and answer the conductor's notes for the section. The section players then follow that lead in rehearsal and performance.
Who looks after the music and the stage?
The orchestra librarian prepares and marks the parts, and the stage manager with the stage crew sets out chairs, stands and risers. Smaller orchestras may give both jobs to one or two people.
Is this the structure every orchestra must use?
No. It is an illustrative, role-based example. Sizes and titles vary by orchestra, country, union and budget, so rename the roles and redraw the lines to match your own ensemble.
Use this org chart template
Open and edit this orchestra hierarchy org chart in QueryChart.