Magazine Editorial Team Hierarchy: Staff Roles and Reporting Lines
A magazine editorial team is led by an editor-in-chief, with a deputy editor over the words, an art director over the look and a production editor over the schedule. This editable chart shows who reports to whom on that team.
Magazine Editorial Team Hierarchy: Staff Roles and Reporting Lines
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
A magazine is made in issues, and the editorial team is shaped by the issue cycle. Writers, editors, designers and production staff work towards a closing date, and the structure has to hand a piece from pitch to print without losing track of it. Titles differ by market. A US magazine usually has a managing editor and a copy chief, while a UK magazine may speak of a production editor and a chief sub-editor.
This chart is an illustrative, role-based example and not a prescribed structure. Sizes and titles vary by publication, country, union and budget, and a small title may have one editor doing several of these jobs.
It covers the editorial side only. The publisher, advertising and circulation sit on the business side and are left out. A newsroom has a different rhythm, with daily deadlines and many desks, and is drawn in its own template.
How a magazine editorial team is organized
The Editor-in-chief is the top role and sets the voice and direction of the magazine. Five branches sit below: Deputy Editor, Managing Editor, Art Director, Digital Editor and Editorial Assistant.
Deputy Editor leads the words. The Features Editor commissions and shapes the longer pieces and works with Senior Editors and Contributing Writers, who are usually freelance and write to a brief. The Department Editor looks after a section such as culture or travel, with Associate and Assistant Editors doing the reporting and editing underneath.
Managing Editor owns the schedule. The Production Editor moves each piece through the stages towards the closing date, and the Copy Chief leads Copy Editors and Fact-checkers who read for accuracy and style. Art Director leads Designers and the Photo Editor, who commissions and chooses pictures with a Photo Researcher. Digital Editor runs the website and social channels. Words and pictures meet at the layout stage, so features editors and the art director work on the same page even though the tree gives each one a single line.
Lead role
Editor-in-Chief
Example top role — Replace this title with whoever sets the editorial direction. UK titles include editor or editorial director.
Deputy Editor
Example function lead — Runs the editorial content day to day and stands in for the editor-in-chief.
Art Director
Example function lead — Owns the look of each issue, including layout, typography and picture choices.
Managing Editor
Example function lead — Owns the issue schedule, closing dates and the flow of copy to production.
Copy Chief
Example function lead — Leads the copy editors and fact-checkers who read every piece before it goes to print.
How to adapt this structure
Words and design have separate heads. Deputy Editor and Art Director each own a half of the page, and the editor-in-chief settles any disagreement between them.
The schedule has its own owner. Managing Editor and Production Editor hold the closing date, so the editors who commission can focus on the content.
Contributing Writers are drawn as a role. Because they are often freelance, the chart shows who commissions them and who edits their work.
Design tradeoffs
- Features, departments and design each have a clear head.
- A cover story needs all three, and the chart gives no line for that shared work.
- The schedule is protected by a dedicated role.
- A small magazine cannot afford one, and the editor-in-chief ends up holding the deadline.
- Fact-checking has an owner.
- It is often the first role cut when budgets tighten, which leaves accuracy to the writers.
What this chart shows
- The Copy Chief sits under Production Editor, because accuracy is checked as a piece moves along the schedule.
- Contributing Writers appear under Features Editor, since longer pieces are where most freelancers are used.
- Editorial Assistant reports straight to the editor-in-chief in this version, which suits a small team. A larger one may place the role under a department editor.
- The chart carries no staff or freelance label, because the same role can be either in different titles.
Related process templates
Frequently asked questions
What is the hierarchy of a magazine editorial team?
It usually runs from the editor-in-chief to a deputy editor, then to features and department editors with their writers, alongside a managing editor, an art director and a digital editor. Titles and the number of levels vary by publication and country.
What does a magazine managing editor do?
In this chart the managing editor owns the issue schedule and the flow of copy to production, with the production editor and copy chief below. Some magazines give the same work to a production editor, and the title varies by country.
Who does the art director report to?
Here the art director reports to the editor-in-chief, level with the deputy editor, so words and design have equal standing. Some magazines place the art director under a creative director or the deputy editor.
Is this the structure every magazine uses?
No. It is an illustrative, role-based example. Rename the roles, merge boxes for a small team and add the departments your own title runs.
Use this org chart template
Open and edit this magazine editorial team org chart in QueryChart.