Airline Operations Control Centre (OCC) Structure and Org Chart
An airline operations control centre (OCC) is usually organised around a shift led by a Duty Operations Controller, with desks for dispatch, network, crew and maintenance. This editable chart shows those desks and the managers who staff and support them.
Airline Operations Control Centre (OCC) Structure and Org Chart
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
The operations control centre is the part of an airline that manages the day of operation. When a flight is delayed, an aircraft is out of position or a crew runs short, people in the OCC weigh the options and agree a recovery. The centre is also called the Operations Control Centre, System Operations Control or Integrated Operations Centre, depending on the airline.
This chart is an illustrative, role-based example and not a prescribed structure. It uses the common US titles Dispatcher and Duty Operations Controller, and notes that European airlines may say Flight Operations Officer or Operations Controller. It does not describe any particular airline, and sizes and titles vary by airline, country, union and budget.
It differs from the [airline cabin crew hierarchy](/org-templates/airline-cabin-crew-hierarchy) because it follows the people who run the operation from a control room and not the people in the cabin. The [airport ground operations team structure](/org-templates/airport-ground-operations-team-structure) shows the teams on the ramp and in the terminal that the OCC works with.
How an airline operations control centre is organized
The Director of Operations Control is the top role. Six branches sit below: Duty Operations Controller, Operations Planning Manager, Crew Control Manager, Maintenance Control Manager, OCC Systems and Data Manager and Operations Standards and Reviews Manager.
Duty Operations Controller is the live line. On each shift one controller leads the centre, and the Dispatcher, Network Controller, Crew Controller, Maintenance Controller and Disruption and Recovery Controller work together at their desks. In the chart each desk reports to the controller on shift. In practice the desk holders also keep a professional line to the manager who owns their field, which a single-parent tree cannot show. Say so in the role notes if your airline works that way.
The other five branches support the shift. Operations Planning Manager owns the Schedule Change Planner and the Aircraft Rotation Planner. Crew Control Manager owns the Standby and Reserve Controller. Maintenance Control Manager owns the Technical Records Liaison. OCC Systems and Data Manager owns the Operations Systems Analyst and the Performance Reporting Analyst. Operations Standards and Reviews Manager owns the Post-Event Review Coordinator. A small airline may combine several desks, and a large one may run a separate OCC for each region.
Lead role
Director of Operations Control
Example top role — Replace this title with the person who owns how the airline runs its day of operation.
Duty Operations Controller
Example shift lead — Leads the centre on one shift and brings the desks together when a disruption needs a joint decision.
Dispatcher
Example desk role — Prepares and follows flights for the operation. Check your aviation authority's rules for what this title carries in your country.
Crew Controller
Example desk role — Keeps flights crewed by working with the roster, standby cover and the crew themselves.
Maintenance Controller
Example desk role — Links the control room and the engineering team about aircraft availability.
How to adapt this structure
The chart separates the live shift from the teams that support it. Planning, crew control, systems and reviews are not distracted by the current disruption and can improve the centre between shifts.
Each desk is named. When an aircraft goes unserviceable, the people to ask about network, crew and maintenance are visible, and the Duty Operations Controller is the one who brings them together.
Post-event reviews have an owner. A disruption turns into lessons only if somebody collects them.
Design tradeoffs
- One controller leads each shift, so decisions during a disruption have one point of coordination.
- A tree draws one manager per desk and hides the line to the function manager, so the dual reporting must be explained in notes.
- Support teams specialise in planning, systems and reviews.
- Their work is felt only when the shift needs a tool or a plan, so they can look distant from the control room floor.
- Every function has a manager and a desk.
- A small airline cannot staff all of them separately, and merged desks lose some of the clarity.
What this chart shows
- The Duty Operations Controller is the only role that repeats across shifts, which is why the chart shows it as a single box.
- The chart has no numbers of desks or staff, since they vary by airline, fleet and network.
- Disruption and Recovery Controller is a role some airlines fold into the Network Controller. It is drawn separately to show where recovery decisions sit.
- In Europe a Dispatcher may be called a Flight Operations Officer, and the title can carry different responsibilities from one country to the next.
Related process templates
Frequently asked questions
What is the structure of an airline operations control centre?
A typical outline has a Director of Operations Control over a Duty Operations Controller who leads each shift. The desks for dispatch, network, crew and maintenance work under that controller during the shift. Planning, systems and standards managers support the centre in the background. Sizes and titles vary, so adapt the chart to your airline.
What does a Duty Operations Controller do?
In this illustrative chart the Duty Operations Controller leads the centre on a shift. The role brings the desks together when a disruption needs a joint decision and keeps the Director informed. The exact authority differs by airline, so write your own into the role note.
What is the difference between a Dispatcher and a Network Controller?
Here the Dispatcher prepares and follows individual flights and the Network Controller looks at the whole schedule and the aircraft rotations. Some airlines combine the two desks, and the legal duties of a dispatcher vary by country, so check your aviation authority's rules.
Is this the structure every airline must use?
No. It is an illustrative, role-based example. Sizes, titles and reporting lines vary by airline, country, union and budget. Rename the roles and redraw the lines to match your own operations control centre.
Use this org chart template
Open and edit this airline operations control centre org chart in QueryChart.