Radio Station Team Structure and Roles

A radio station is usually run by a Station Manager with a Programme Director (US: Program Director) for what goes on air, plus news, engineering, sales and promotions teams. This editable chart shows how those teams can be drawn together.

Radio Station Team Structure and Roles

Use this template

Illustrative, editable reporting structure. Adapt roles and lines to your organization.

About this department template

A radio station has two jobs that depend on each other. It makes a stream of programmes that people want to hear, and it sells the audience's attention to advertisers or finds the money some other way. The structure follows that split, with the on-air side kept apart from the commercial side.

This chart is an illustrative, role-based example and not a prescribed structure. It does not describe any particular station. It uses the UK spelling Programme Director and shows the US spelling Program Director beside it once, and other titles differ by country and network.

It shows a single local station. A network, a public broadcaster or a very small community station will look different. Sizes and titles vary by station, country, union and budget, and many small stations share one person across several of these roles.

How a radio station is organized

The Station Manager is the top role. Five branches sit below: Programme Director (Program Director), News Editor, Chief Engineer, Sales Manager and Promotions and Digital Manager.

Programme Director owns the sound of the station. The Music Director chooses the music, helped by a Music Scheduler who builds the playlists to the station's rules. The Senior Producer leads the Show Producer, who prepares guests and content for a programme, and the Studio Operator, who runs the desk. The Breakfast Presenter, Daytime Presenter and Weekend Presenter are the voices on air and take their direction from the Programme Director.

News Editor runs the bulletins and local stories with a Reporter, who gathers them, and a Newsreader, who reads them. Chief Engineer keeps the studios, the links and the transmitter or stream working, and the Broadcast Engineer handles day-to-day faults. Sales Manager leads the Account Executive, who sells advertising, and the Traffic Coordinator, who schedules the adverts and checks they ran. Promotions and Digital Manager runs the station's marketing and online presence with a Digital Content Producer.

In practice the News Editor often reports to the Programme Director or to the Station Manager, and presenters work day to day with the Music Director and the producers. The tree shows one line each, and you can note the second in a label.

Lead role

  1. Station Manager

    Example top role — Replace this title with whoever owns the station's budget, licence relationships and results, such as a general manager.

  2. Programme Director (Program Director)

    Example key role — Owns the schedule, the music policy and the sound of the station.

  3. News Editor

    Example key role — Owns bulletins and local reporting and decides what goes into the news.

  4. Chief Engineer

    Example key role — Owns the technical chain from studio to listener and the backup plan if it fails.

  5. Sales Manager

    Example key role — Owns advertising and sponsorship income and the relationship with clients.

How to adapt this structure

The on-air branch and the commercial branch are separate. A Programme Director can protect the sound of the station while a Sales Manager sells around it, and the Station Manager settles clashes between them.

News has its own editor. A news desk keeps its independence from the music schedule and from advertisers more easily when the line to the Station Manager is short.

Engineering has a named owner. When the stream or the transmitter goes down, everyone knows who decides on the fix and who calls the Station Manager.

Design tradeoffs

Programming has a single owner.
Presenters, producers and music all answer to the Programme Director, who can become a bottleneck at busy times.
Sales is its own branch.
Advertising promises have to be fitted into the on-air schedule, so Sales Manager and Programme Director need a regular meeting.
News is kept near the top.
A small news desk can be stretched thin, and the News Editor may need cover from the producers on busy days.

What this chart shows

  • Presenters sit directly under Programme Director and not under a producer, because a presenter is chosen for how they sound over time.
  • Studio Operator is a role that many stations fold into the presenter, so the box can be removed on a station where hosts run their own desk.
  • Programme Director (Program Director) is spelled both ways, so rename the box to match the term in your market.
  • Traffic Coordinator is named for the adverts and the log, and has nothing to do with road traffic.

Frequently asked questions

What does a station manager do at a radio station?

The Station Manager runs the station as a business and is accountable for budget, staffing and results. The role works with the programme director on the sound, with sales on income and with engineering on reliability. The title varies, and many stations call this person a general manager.

What is the difference between a programme director and a music director?

The Programme Director (Program Director) owns the whole schedule, including talk, news and music. The Music Director owns the music side only, choosing the songs and the rules for playing them. In a small station one person often holds both titles.

Where does the news editor sit in a radio station?

The News Editor often reports to the Programme Director or directly to the Station Manager. Many stations prefer the second so news is separated from the music schedule. The chart shows one line, and you can add a note for the other.

Is this the structure a radio station must use?

No. It is an illustrative, role-based example. Merge boxes for a community or very small station, add shifts for a large one and rename titles to match your network and your country.

Use this org chart template

Open and edit this radio station org chart in QueryChart.

Use this template

More in Company Organizational Charts & Structure Examples

This is an illustrative, role-based organizational chart template. It does not describe any particular radio station, prescribe a required reporting model or establish approval authority. Titles, team sizes and reporting lines vary by station, country, union and budget, so check your local rules and adapt the roles to your organization.