Airport Ground Operations Team Structure and Roles
An airport ground operations team is usually led by a Station Manager, with Duty Managers running each shift over ramp, passenger services, baggage and equipment teams. This editable chart shows those roles and how they connect.
Airport Ground Operations Team Structure and Roles
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
Ground operations is the work that happens around an aircraft between landing and departure: unloading and loading, baggage, checking passengers in, boarding, cleaning and getting the aircraft ready to leave. At a busy station many people do these jobs at once, and the structure decides who tells whom.
This chart is an illustrative, role-based example and not a prescribed structure. Sizes, titles and reporting lines vary by airport, airline, handling company, country, union and budget, and it does not describe any particular operation.
It stays on one station and its ground teams. It does not cover the central control room that plans the whole network, which is a different kind of organisation.
How an airport ground operations team is organized
The Station Manager is the top role at the station. Five branches sit below: Duty Manager, Passenger Services Manager, Baggage Services Manager, Ground Equipment Manager and Safety and Training Coordinator.
Duty Manager is the shift role. Under it, Ramp Supervisor leads the Baggage Handlers, Aircraft Loaders and Pushback Drivers who work at the aircraft. Turnaround Coordinator keeps the turnaround on schedule and works with the Cabin Cleaning Team Lead, and Load Controller prepares the load information for the flight. In many operations a Duty Manager is the first person a team calls when something changes.
Passenger Services Manager covers the terminal side. Check-in Supervisor leads the Check-in Agents, Gate Supervisor leads the Gate Agents and Special Assistance Coordinator arranges help for passengers who need it. Baggage Services Manager owns the baggage hall, with a Sortation Supervisor over Sortation Operators and Baggage Tracing Agents who deal with delayed or missing bags.
Ground Equipment Manager looks after tugs, loaders and other vehicles through Equipment Technicians. Safety and Training Coordinator supports every team with induction and refresher training. Real stations often combine roles, share them across airlines or buy some of them from a handling company, so merge or split the boxes to match.
Lead role
Station Manager
Example top role — Replace this title with whoever owns the station's results across all ground teams.
Duty Manager
Example shift lead — Runs the shift and is the point where ramp, passenger and baggage teams meet.
Ramp Supervisor
Example function lead — Leads the people working at the aircraft.
Turnaround Coordinator
Example function lead — Keeps each turnaround moving between arrival and departure.
Passenger Services Manager
Example function lead — Owns check-in, gates and passenger assistance.
How to adapt this structure
The chart separates the shift from the function. Duty Manager answers for today, while the service and equipment managers answer for how their teams are run over time.
Turnaround Coordinator and Load Controller are drawn as their own roles, which shows that the schedule and the load information have owners and are not left to whoever is nearest.
Passenger and baggage teams have their own managers, so a long check-in queue and a late baggage belt can be handled without pulling people from the ramp.
Design tradeoffs
- The Duty Manager gives each shift one point of contact.
- A single shift role can be overloaded during disruption, so a deputy is worth drawing.
- Passenger, baggage and ramp teams can specialise.
- Each handover between teams, such as a late bag at the gate, needs a clear owner.
- Safety and training sit with one role.
- The role can drift from the floor if it is not tied to the shift leads.
What this chart shows
- The Duty Manager is the only role that spans ramp, passenger services and baggage in the shift view.
- Baggage Handler and Sortation Operator are different roles, one at the aircraft and one in the baggage hall.
- Load Controller is drawn under Duty Manager here, although in some operations it sits with the airline or a central team.
- The chart has no airline names, because the same roles appear whichever airline the station serves.
Related process templates
Frequently asked questions
What does a Station Manager do at an airport?
A Station Manager is the senior person at one airport for an airline or handling company. The role usually owns the station's results, its people and its relationships with the airport and other operators. Duties vary by employer, so treat this chart as a starting point and adjust the title and scope to your own station.
What is the difference between a Duty Manager and a Ramp Supervisor?
A Duty Manager runs a whole shift across ramp, terminal and baggage teams. A Ramp Supervisor leads only the people working at the aircraft. In this chart the Ramp Supervisor reports to the Duty Manager, but in some operations the two roles sit side by side.
Who is in charge of an aircraft turnaround?
Often a Turnaround Coordinator or the Duty Manager keeps the turnaround on time, while each team lead runs their own part. The chart draws Turnaround Coordinator as a separate role so you can see who watches the whole picture. Rename it to match your station.
How big is an airport ground operations team?
It varies a great deal with the size of the airport, the number of flights and whether handling is done by the airline or a separate company. Draw only the roles you have, and merge boxes where one person covers several.
Use this org chart template
Open and edit this airport ground operations org chart in QueryChart.