Theatre Production Team Hierarchy: Producer to Stage Crew
A theatre production team hierarchy has a producer at the top, a creative team led by the director and a production manager who runs the technical, wardrobe, props and stage management teams. This chart draws those roles from producer to stage crew.
Theatre Production Team Hierarchy: Producer to Stage Crew
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
A theatre production brings together two kinds of work. The creative team decides what the audience sees and hears, and the production team builds it, runs it and keeps it the same every night. The two teams meet at the stage manager, who calls the show once it opens.
This chart is an illustrative, role-based example and not a prescribed structure. Sizes and titles vary by production, country, union and budget, and it does not describe any particular theatre or show.
It differs from the other performing arts charts in this set because it goes deep on a single production team, from the producer through the creative and technical departments to the crew who work backstage.
How a theatre production team is organized
The Producer is the top role and raises the money, hires the key people and carries the budget. Two branches sit directly below. The Director leads the creative team, and the Production manager leads the delivery team. The Company manager handles the cast and contracts and reports to the Producer in this drawing. Where a theatre has a general manager or an artistic director, that role usually sits above or beside the Producer.
The creative branch has the Director over the Choreographer, Musical director and the set, costume, lighting and sound designers. Designers work with the Director on the look and then hand their plans to the delivery team. Dual lines are common here, because a designer is also working with the production manager on cost and schedule, and the tree shows only the creative line.
The Production manager owns schedule and budget for the build and the run. The Technical director leads three leads. They are the Master carpenter with the stage crew, the Chief electrician with the lighting crew and the Head of sound with the sound operator. The Costume supervisor leads the Head of wardrobe, who leads the Dressers and a Wardrobe assistant. The Props supervisor looks after the props. The Stage manager runs rehearsals and calls the show, supported by a Deputy stage manager and an Assistant stage manager. In the UK the deputy stage manager often calls the show, and in the US the stage manager does.
Lead role
Producer
Example top role — Replace this title with the person who holds the budget and hires the key team.
Director
Example creative lead — Owns the artistic vision and leads the designers and performers.
Production manager
Example delivery lead — Owns the build schedule and the budget for sets, lights, sound, wardrobe and props.
Stage manager
Example stage management lead — Runs rehearsals, then runs the show each night and keeps it as the director intended.
Technical director
Example technical lead — Turns the set and lighting designs into something that can be built and operated.
How to adapt this structure
The chart separates the creative team from the delivery team. The director is not asked about a lighting cable, and the production manager is not asked about a performance note.
Stage management has its own line. It shows who carries the show from the rehearsal room to the stage and who answers backstage questions during a performance.
Wardrobe, props and technical teams each have one head. A designer or director knows exactly who to ask for a costume change or a prop.
Design tradeoffs
- The producer sees budget and creative decisions in one place.
- The producer can become a bottleneck when many approvals arrive during the technical rehearsal.
- Technical, wardrobe and props each have a head.
- A change that touches all three needs the production manager to coordinate.
- The stage manager sits with the production manager.
- The role also works closely with the director, and the tree cannot draw that second line.
What this chart shows
- The Stage manager is drawn under the Production manager, but in rehearsal the role also takes day to day direction from the Director.
- Dressers and Stage crew are drawn as group boxes, so one box stands for everyone doing that job.
- The Deputy stage manager title is used in the UK and the US, but the person who calls the show differs by country and company.
- No role names a person, so the chart works for a school play and a touring show alike.
Frequently asked questions
Who is in charge of a theatre production?
The producer holds the budget and hires the key team, and the director leads the creative work. In day to day delivery the production manager is the lead. During a performance the stage manager runs the show. Names and lines vary between companies.
What does a production manager do in theatre?
The production manager owns the schedule and budget for building and running the show. They coordinate the technical director, wardrobe, props and stage management, and they are the person designers go to when a plan has to be costed or fitted into the time available.
What is the difference between a stage manager and a deputy stage manager?
The stage manager leads the stage management team and runs rehearsals and the show. The deputy stage manager supports them and often prompts or calls cues. The split varies by country and company, so check how your production divides the work.
Where do the designers sit in the hierarchy?
Designers work under the director on the creative side and work with the production manager on cost and schedule. The tree shows the creative line only. Add a note on the chart for the second line if it matters to your team.
Is this the structure every theatre production must use?
No. It is an illustrative, role-based example. Sizes and titles vary by production, country, union and budget, so rename the roles and redraw the lines to match your own company.
Use this org chart template
Open and edit this theatre production team org chart in QueryChart.