Newsroom Hierarchy: Who Does What in a Newsroom (Org Chart)
A newsroom hierarchy is a chain of editors, with the editor-in-chief at the top, desk editors in the middle and reporters closest to the story. This editable chart shows that chain at desk level, with one tier of staff below each editor.
Newsroom Hierarchy: Who Does What in a Newsroom (Org Chart)
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
A newsroom is organised around one question: who decides what runs, and who checks it before it does. Titles differ between the US and the UK and between outlets, so the chart uses the common US terms first, with the UK equivalent noted once. A US managing editor often runs the daily operation, while a UK deputy editor may do much of that work.
This chart is an illustrative, role-based example and not a prescribed structure. Sizes and titles vary by outlet, country, union and budget, and a small local title may have one person in several of these boxes.
It shows the whole newsroom at desk level, with one level of staff below each editor. Deeper charts for a single kind of organisation, such as a magazine, sit alongside it in the media and publishing set.
How a newsroom is organized
The Editor-in-chief is the top role and holds final responsibility for what the outlet publishes. Five branches sit below: Managing Editor, Executive Editor, Photo Editor, Digital Editor and Opinion Editor.
Managing Editor runs the machinery of publishing. The Copy Desk Chief leads the Copy Editors and Fact-checkers who read each story before it goes out, and the Production Editor keeps pages, schedules and deadlines moving. Executive Editor owns the news itself. The News Editor directs the day's desks, and the Politics, Business and Sport Editors each lead a reporter. Features and Foreign Editors sit on the same branch, with a Feature Writer and a Correspondent.
Photo Editor leads Photographers and the Graphics Editor. Digital Editor leads the Social Media Editor and the Newsletter Producer, who carry stories to readers who never open the front page. Opinion Editor sits apart from the news branch on purpose, so that columns are commissioned and edited separately from reporting. In practice a reporter often answers to a desk editor on a story and to a features editor on a long project. The tree draws one line per person and the dual line is described here instead.
Lead role
Editor-in-Chief
Example top role — Replace this title with whoever holds final editorial responsibility. At some outlets this is called the editor, the top editor or the executive editor.
Managing Editor
Example function lead — Owns the daily running of the newsroom, including schedules, copy flow and deadlines.
Executive Editor
Example function lead — Owns news coverage through the desk editors and decides priorities across the day's stories.
News Editor
Example function lead — Directs the news desks day to day and assigns reporters to stories.
Copy Desk Chief
Example function lead — Leads the readers who edit, check and correct a story before publication.
How to adapt this structure
The chart separates running the newsroom from deciding what the news is. Managing Editor protects the schedule while Executive Editor protects the coverage, so neither crowds out the other.
Copy editing and fact-checking sit on their own branch. A story passes a reader who did not report it, which is how most newsrooms try to catch mistakes before readers do.
Digital and Opinion are drawn as branches of their own. That shows where audience work and commentary are owned, and it keeps both from being treated as an afterthought of the news desk.
Design tradeoffs
- Each desk has one editor who knows the beat.
- Stories that cross beats need a conversation between desk editors, and the chart shows no line for it.
- Copy and fact-checking have an owner.
- A small newsroom may not afford a separate branch and will merge the boxes into a few people.
- Digital has its own editor.
- Digital work can drift apart from the news desks unless the two editors meet often.
What this chart shows
- Reporters, correspondents and writers are the only fourth-level roles in most branches, which keeps the tree shallow.
- News Editor sits under Executive Editor, so the three desk editors share one line of authority.
- Opinion Editor reports to the Editor-in-chief rather than to the news branch, which mirrors the separation many outlets keep between reporting and comment.
- The chart names no outlet and no person, since the same title can mean different work at different organisations.
Related process templates
Frequently asked questions
What is the hierarchy in a newsroom?
It usually runs from the editor-in-chief to managing and executive editors, then to desk editors such as news, politics, business and sport, and then to reporters and copy editors. Photo, digital and opinion staff sit alongside. Titles and levels vary by outlet and country.
What is the difference between a managing editor and an executive editor?
The terms vary. In this chart the managing editor runs the daily operation, such as schedules and copy flow, while the executive editor directs news coverage. At some outlets the two titles swap meaning, and in the UK a deputy editor often does the managing editor's work.
Where do copy editors and fact-checkers fit?
Here they sit under a copy desk chief on the managing editor's branch, because they check every story rather than serve one desk. Some outlets place fact-checkers with a standards editor or inside the magazine-style research team.
Is this the structure every newsroom uses?
No. It is an illustrative, role-based example. Rename the roles, merge boxes for a small team and add the desks your own outlet runs.
Use this org chart template
Open and edit this newsroom org chart in QueryChart.