Pastry Kitchen Hierarchy: Pastry Chef and Baker Roles Chart

A pastry kitchen is led by an executive pastry chef, with a pastry sous chef over chefs de partie for plated desserts, viennoiserie, bread, chocolate and ice cream. This editable chart shows how those sections report.

Pastry Kitchen Hierarchy: Pastry Chef and Baker Roles Chart

Use this template

Illustrative, editable reporting structure. Adapt roles and lines to your organization.

About this department template

A pastry kitchen follows the same ladder as the savoury brigade but divides its work by product and by timing. Doughs are laminated overnight, bread is baked before dawn and plated desserts are finished during service. In the US the head is usually the executive pastry chef, in the UK the head pastry chef, and in France the chef patissier.

This chart is an illustrative, role-based example and not a prescribed structure. Sizes and titles vary by kitchen, country, union and budget, and a small bakery may have one person doing several of these jobs.

It goes deeper on the pastry team than the [kitchen brigade hierarchy](/org-templates/kitchen-brigade-hierarchy), where pastry is a single branch. For the whole restaurant see the [restaurant business organizational chart](/org-templates/restaurant-business-organizational-chart).

How a pastry kitchen is organized

The Executive pastry chef is the top role and owns the dessert menu, the bake plan and the cost of the section. A Production planner supports the chef with orders and prep lists, which matters because pastry is made ahead and cannot be rushed on the day.

Pastry sous chef is second in command and supervises the sections. Below it, Chef de partie patissier leads plated desserts with a Pastry cook and a Commis patissier. Chef de partie viennoiserie leads laminated dough such as croissants. Boulanger is the head baker, responsible for bread, with a Baker and a Baker's assistant. Chocolatier leads chocolate and confectionery, and Glacier leads ice cream and frozen desserts. Each has one cook below, who makes the daily product.

Cake decorator finishes and decorates, and a Pastry commis moves between sections to help. Pastry kitchen porter keeps the section clean. In many kitchens the Boulanger reports outside the pastry team, for example straight to the executive chef, and some businesses split bakery and pastry completely. The tree shows one common version, so move the branch if yours differs.

Lead role

  1. Executive pastry chef

    Example top role — Owns the dessert menu, the bake plan and costs. Replace with head pastry chef or pastry chef as your kitchen says.

  2. Pastry sous chef

    Example deputy — Second in command. Supervises sections and covers the chef.

  3. Chef de partie patissier

    Example section lead — Runs the plated dessert station during service.

  4. Boulanger

    Example section lead — Head baker, who plans fermentation and the morning bake.

  5. Chocolatier

    Example section lead — Owns chocolate work and confectionery.

How to adapt this structure

Sections follow the product, so a laminated dough problem has one owner and a bread problem has another.

A Production planner makes the make-ahead nature of pastry visible and keeps the sections working to the same bake plan.

Giving every section a lead and a cook builds a ladder from commis to chef de partie that matches the savoury kitchen.

Design tradeoffs

Each product line has a specialist lead.
Small kitchens cannot staff every section, so roles must be combined.
Early and late shifts can be planned by section.
Handover between the night bake and the day service needs a clear note.
Clear route from commis to chef de partie.
Narrow specialist lines can limit what a junior learns.

What this chart shows

  • Boulanger is the French word for baker, while patissier is the pastry cook.
  • The bread section often starts work when the savoury kitchen is still closed.
  • Many pastry kitchens keep a separate cold room, which is why the section is often planned apart from the hot line.
  • The chart has no front of house roles, since those sit on their own pages.

Related process templates

Frequently asked questions

What is the hierarchy in a pastry kitchen?

From the top, executive pastry chef, pastry sous chef, chefs de partie for each section, then pastry cooks and commis, with porters at the base. Titles and layers vary by kitchen and country, and small bakeries merge many of these roles into a few people.

What is the difference between a pastry chef and a boulanger?

A pastry chef makes desserts, cakes and sweet goods. A boulanger is a baker who makes bread and sometimes laminated dough. Some businesses treat them as one team and others keep them apart, so draw the reporting line your kitchen uses.

What does a chef de partie patissier do?

A chef de partie patissier leads one pastry section, often plated desserts. They plan and make that section's products, train the commis and report to the pastry sous chef or the pastry chef.

Is this the structure every pastry kitchen must use?

No. It is an illustrative, role-based example. Rename the roles and redraw the lines to match your kitchen, and check your local rules for anything that affects staffing.

Use this org chart template

Open and edit this pastry kitchen chart in QueryChart.

Use this template

More in Company Organizational Charts & Structure Examples

This is an illustrative, role-based organizational chart template. It does not describe any particular restaurant, prescribe a required reporting model or establish approval authority. Titles, sizes and lines of report vary by kitchen, country, union and budget, and food safety, licensing and employment rules differ by place, so check your local rules. Adapt roles and hierarchy to your own team.