TV Studio Production Team Structure: Director, Vision Mixer, Floor Manager

A TV studio production team splits into the producer's side, which plans the show, and the director's side, which makes it on air from the gallery and the studio floor. This editable chart shows who does what, from Executive Producer to floor crew.

TV Studio Production Team Structure: Director, Vision Mixer, Floor Manager

Use this template

Illustrative, editable reporting structure. Adapt roles and lines to your organization.

About this department template

A studio show, such as a news bulletin, a chat show or a game show, is made by two linked groups. One plans the content and the other turns it into pictures and sound. The groups meet at the Studio Director, who calls the show from the control room, also called the gallery.

This chart uses US job titles first, and gives the UK term where it differs. In US usage the person who switches between camera sources is the Technical Director, while in UK usage the Vision Mixer does that job and a separate technical role looks after engineering. The Floor Manager is called the Stage Manager in the US. It is an illustrative structure. Sizes and titles vary by production, country, union and budget.

It describes studio television, which is a different working pattern from a film set. For a film set at department-head level, see [film crew hierarchy](/org-templates/film-crew-hierarchy).

How a TV studio production team is organized

The Executive Producer is the top role. Two branches sit below: the Producer, who owns the content, and the Studio Director, who owns how the show looks and sounds on air.

The Producer leads Segment Producers, who prepare individual items, an Associate Producer, a Production Manager who handles budget and schedule, and Researchers who find guests and facts. These roles do most of their work before the show goes out.

The Studio Director leads everything that happens during rehearsal and transmission. The Associate Director and Production Assistant help with timing and cueing. In the gallery the Technical Director cuts between sources and the Graphics Operator, Replay Operator, Video Engineer and Audio Mixer provide pictures, graphics, replays, picture quality and sound. A Boom Operator works for the Audio Mixer on the floor.

On the studio floor the Floor Manager is the Studio Director's link to the people in the room. The Floor Manager looks after Floor Assistants and Scenic Crew and gives the cue for the presenter to speak. The Camera Supervisor leads Camera Operators, who take shots on the Studio Director's instruction through talkback. A Teleprompter Operator is drawn under the Camera Supervisor because the prompter is mounted on a camera. The Lighting Director designs and operates the studio lights with a Lighting Console Operator.

A tree has one parent per box. In practice the Producer and Studio Director talk constantly during a live show, and the Production Assistant times the programme for both. Note those links on your own chart.

Lead role

  1. Executive Producer

    Example top role — Owns the show as a whole, including editorial standards, budget and the team that makes it.

  2. Producer

    Example content lead — Plans each programme, books guests and items and decides what goes in the running order.

  3. Studio Director

    Example director — Calls the show from the gallery, instructs cameras and the Technical Director and keeps to the running order.

  4. Technical Director

    Example gallery lead — Switches between camera and video sources on the Studio Director's instruction. Called Vision Mixer in UK usage.

  5. Floor Manager

    Example floor lead — Studio Director's link to the floor: cues the presenter and guests and looks after the floor crew.

  6. Audio Mixer

    Example sound lead — Balances microphones, music and playback. Called Sound Supervisor in some UK studios.

How to adapt this structure

The chart separates planning from transmission. The Producer's team can work on tomorrow's show while the Studio Director's team makes today's.

Gallery and floor are drawn apart. The Studio Director gives instructions to the gallery by voice and to the floor through the Floor Manager, which matches how a studio is arranged.

Each technical skill has a named owner. Sound, vision, graphics and replay can be staffed or merged to suit the show.

Design tradeoffs

The Studio Director has a single line to every craft in the gallery.
Many roles report to one person, so a larger show often adds a deputy such as an Associate Director.
Producer and Studio Director can agree changes quickly.
If editorial and directing priorities clash on air, the Executive Producer has to settle it.
The Floor Manager keeps the presenter's cues in one place.
The Floor Manager and Camera Supervisor share the floor, so their cues must not overlap.

What this chart shows

  • Technical Director and Vision Mixer name much the same job in the US and UK, which is a common source of confusion between crews.
  • Teleprompter Operator sits under the Camera Supervisor because the prompter is attached to a camera.
  • Graphics Operator and Replay Operator are optional on small shows and may be merged with another gallery role.
  • A live show and a recorded show use the same chart, but a recorded show may have more time to fix mistakes after the fact.

Frequently asked questions

What does a vision mixer do in a TV studio?

A vision mixer, called a Technical Director in US usage, switches between camera and video sources on the Studio Director's instruction. They cut, dissolve or add effects so the programme on air follows the planned shots. They work in the gallery and listen to the Studio Director on talkback.

What is the difference between a Producer and a Studio Director?

The Producer decides what is in the show: the items, guests and running order. The Studio Director decides how it looks and sounds on air and calls the shots from the gallery. In a small show one person may do both, and the Executive Producer sits above them.

What does a Floor Manager do?

A Floor Manager, called Stage Manager in the US, is the Studio Director's link to the studio floor. They relay instructions, cue presenters and guests, manage the floor crew and keep the studio safe and quiet while the show goes out.

What is the gallery in a TV studio?

The gallery is the control room beside the studio. The Studio Director, Technical Director, audio, graphics and replay staff sit there and watch monitors of every source. The studio floor is the room where cameras, set and talent are.

Is this the structure every TV studio must use?

No. It is an illustrative, role-based example. Studio shows differ by country, union, channel and budget. Merge or add boxes and redraw the lines to match your own team.

Use this org chart template

Open and edit this TV studio production team org chart in QueryChart.

Use this template

More in Company Organizational Charts & Structure Examples

This is an illustrative, role-based organizational chart template. It does not describe any particular broadcaster, production company or union, prescribe a required reporting model or establish approval authority. Sizes and titles vary by production, country, union and budget. Adapt roles, hierarchy and cross-functional notes to your own studio.