Film Art Department Hierarchy

In a film art department the Production Designer leads, with an Art Director running the drawings and builds, a Set Decorator running the dressing, a Property Master running props and a Construction Coordinator running the build. This editable chart draws those lines and the crew under each.

Film Art Department Hierarchy

Use this template

Illustrative, editable reporting structure. Adapt roles and lines to your organization.

About this department template

The art department designs and builds everything the camera sees that is not a person or a light: sets, furniture, props, graphics and painted surfaces. It is led by the Production Designer, who answers to the director on the look of the film and works closely with the Director of Photography.

This chart is an illustrative, role-based example and not a prescribed structure. It follows US usage, where the Set Decorator and the Property Master report to the Production Designer alongside the Art Director. Sizes, titles and reporting lines vary by production, country, union and budget. In UK usage, for example, the Standby Art Director and the Construction Manager are drawn in different places.

It differs from the whole-set chart in [film crew hierarchy](/org-templates/film-crew-hierarchy) because it goes one department deep. Camera and electrical crews are covered in [camera department hierarchy](/org-templates/camera-department-hierarchy) and [lighting and grip department hierarchy](/org-templates/lighting-and-grip-department-hierarchy).

How a film art department is organized

The Production Designer is the top role. Below sit six branches: Art Director, Set Decorator, Property Master, Construction Coordinator, Concept Illustrator and Art Department Coordinator.

The Art Director turns the designer's vision into drawings and a budget that the builders can follow. The Standby Art Director is on set during shooting to keep the look consistent from take to take, and the Assistant Art Director, Set Designer and Graphic Designer produce plans, models and the signs, newspapers and screens that appear on camera. The Set Decorator owns everything that dresses a set. A Leadman runs the Set Dressers, who place and strike furniture and fabrics, and a Buyer sources and rents items. The Property Master owns the props that actors handle, with an Assistant Property Master on set and Prop Makers building what cannot be bought.

The Construction Coordinator runs the build. A Construction Foreman leads the Carpenters, and a Head Scenic Artist leads the Scenic Painters who age, paint and finish surfaces. The Art Department Coordinator keeps schedules, purchase orders and paperwork moving, supported by Art Department Assistants.

In practice some lines are shared. The Standby Art Director often works with the Set Decorator and the Property Master on the day, and the Construction Coordinator also works with the Art Director on budget. A tree draws one parent per person, so such dual lines are best noted on the chart. A small production may have one person who is both Art Director and Set Decorator, and a very large one may add a Supervising Art Director over several units.

Lead role

  1. Production Designer

    Example top role — Owns the visual design of the film and answers to the director. Replace this title with the head of design on your production.

  2. Art Director

    Example department lead — Owns drawings, build budget and coordination of the design team.

  3. Set Decorator

    Example department lead — Owns the dressing of every set, from furniture to fabrics, within the designer's look.

  4. Property Master

    Example department lead — Owns the props that actors use and the continuity of those props between takes.

  5. Construction Coordinator

    Example department lead — Owns the build and its schedule, working from the Art Director's drawings.

How to adapt this structure

The chart separates design, dressing, props and building. Each branch has its own budget line and its own supplier, so a problem in one rarely stops the others.

It shows the Art Director and the Set Decorator as peers under the designer. That matches how the two jobs are usually split in US usage: one owns the structure of the set and the other owns what is inside it.

It gives the coordinator a place in the structure. Purchase orders, deliveries and rentals pass through one role, which keeps the department's paperwork from landing on the heads.

Design tradeoffs

Every branch has a single lead who speaks for it.
The Production Designer has six direct reports, so a busy prep week can leave decisions waiting.
Dressing and props are separate.
An item an actor handles and a prop that sits on a shelf can be argued over, so the line between them needs agreeing early.
Construction has its own lead.
The Construction Coordinator and the Art Director both shape the build budget, so changes need one agreed channel.

What this chart shows

  • The chart has four levels, with the Production Designer at the top and crew roles such as Set Dresser, Carpenter, Scenic Painter and Art Department Assistant at the bottom.
  • The Standby Art Director is drawn under the Art Director, although on the day this role works closely with dressing and props.
  • Concept Illustrator reports directly to the Production Designer, since concept work often happens before an Art Director is hired.
  • No role carries a union label, because the same title can be covered by different agreements in different countries.

Frequently asked questions

What is the hierarchy in a film art department?

The Production Designer leads. Below come the Art Director, Set Decorator, Property Master and Construction Coordinator, each with their own crew. Exact lines vary by production, country and union, so treat this chart as an illustrative starting point to adapt.

What is the difference between a Production Designer and an Art Director?

The Production Designer owns the overall look of the film and answers to the director. The Art Director works under the designer, turning that look into drawings, budgets and builds, and manages the design team that produces them.

Does the Set Decorator report to the Art Director?

In US usage the Set Decorator usually reports to the Production Designer and works alongside the Art Director. In other markets or on small productions the lines can differ, so redraw the chart to match your own department.

Where do props fit in the art department?

Props sit under the Property Master, who reports to the Production Designer. Items actors handle are props, while furniture and fabrics belong to the Set Decorator. Agree borderline items early so that neither lead assumes the other has them.

Use this org chart template

Open and edit this film art department org chart in QueryChart.

Use this template

More in Company Organizational Charts & Structure Examples

This is an illustrative, role-based organizational chart template. It does not describe any particular production, prescribe a required reporting model or reflect any union agreement. Adapt roles, hierarchy and dual lines to your own production.