Laboratory quality control process flowchart

A laboratory quality control workflow for planning controls, preparing QC samples, running acceptance checks, reviewing failures, assessing sample results and documenting release decisions.

Use this template

What the laboratory quality control process is

The template separates control planning, execution and review from the sample-result decision, so a failed control leads to a documented response rather than a silent retry. It is deliberately a starting point: adapt the roles, criteria, records and escalation thresholds to the services and risks your laboratory actually manages.

The meaningful branches are not footnotes. Required controls available and valid?, Control results within acceptance criteria? and Sample results supported by QC? decide whether routine work can proceed or whether the laboratory must hold, clarify, investigate or escalate the work.

This template does not establish compliance with any standard or regulation. Confirm the procedure, safety controls, authorization roles and retention requirements that apply at your site before making it effective.

What this flowchart covers

In this template

  • Five stages from plan controls through release across the roles that own this workflow.
  • A documented positive and negative path for required controls available and valid?, so an exception stays visible rather than disappearing from the flow.
  • The control results within acceptance criteria? gate before routine work continues, with a hold, investigation or remediation path where it does not.
  • A final sample results supported by qc? decision that routes both outcomes through controlled records and closure.
  • Editable swimlanes and labels that can be aligned with the laboratory's approved methods, local forms and quality-system terminology.

When to use this template

  • You need a general QC workflow for analytical, environmental, research or contract laboratory work that can be adapted to the controls your method requires.
  • You are revising an SOP, training material or audit-ready process map and need the failure paths visible alongside the routine path.
  • Several teams own parts of the workflow and need a shared view of the handoffs, evidence and escalation points.

How it works

  1. Set the real roles and records

    Replace the example lanes with the people who actually perform Analyst / Technician, Senior Analyst, Quality Control. Add the SOP, form, system or logbook that provides evidence at each handoff.

  2. Define the decision criteria

    Write the site-specific rule behind each decision, especially required controls available and valid?, control results within acceptance criteria? and sample results supported by qc?. Do not leave a result-dependent decision to informal judgement.

  3. Test the exception paths

    Walk a recent non-routine case through the hold, clarification, investigation or remediation branches. Change the chart wherever the real response differs from the draft.

  4. Approve and review the procedure

    Route the completed process through your document-control and approval process, train the affected roles and review it when methods, systems, responsibilities or risks change.

Frequently asked questions

What does this laboratory quality control process flowchart cover?

The template separates control planning, execution and review from the sample-result decision, so a failed control leads to a documented response rather than a silent retry. It includes the decision points and exception routes needed to prevent a failed check or unclear handoff from being treated as routine work.

Can this template be used in a regulated laboratory?

It is an editable starting point, not a compliance claim. Regulated and accredited laboratories should align the roles, records, acceptance criteria, method controls and approvals to their applicable framework and approved quality system.

How should we adapt the workflow?

Start with the actual records and roles used at the site, define the criteria behind each decision, then test the exception branches against a recent real case. Remove steps that do not occur and add required local controls before approval.

Part of

QueryChart features for this process

Use this template

More in Laboratory SOP & process templates

Browse all Laboratory SOP & process templates

Laboratory quality control process: Plan controls → Prepare → Run QC → Review → Release
Laboratory quality control process flowchart