Laboratory testing process flowchart
A laboratory testing workflow covering method selection, equipment and reagent readiness, sample preparation, system suitability, quality control, result review and reporting.
What the laboratory testing process is
The template separates preparation and readiness from the test itself, then routes failed quality checks into investigation instead of treating a result as reportable by default. It is deliberately a starting point: adapt the roles, criteria, records and escalation thresholds to the services and risks your laboratory actually manages.
The meaningful branches are not footnotes. Current method selected?, Equipment and materials ready? and System suitability or QC acceptable? decide whether routine work can proceed or whether the laboratory must hold, clarify, investigate or escalate the work.
This template does not establish compliance with any standard or regulation. Confirm the procedure, safety controls, authorization roles and retention requirements that apply at your site before making it effective.
What this flowchart covers
In this template
- Five stages from plan through report across the roles that own this workflow.
- A documented positive and negative path for current method selected?, so an exception stays visible rather than disappearing from the flow.
- The equipment and materials ready? gate before routine work continues, with a hold, investigation or remediation path where it does not.
- A final system suitability or qc acceptable? decision that routes both outcomes through controlled records and closure.
- Editable swimlanes and labels that can be aligned with the laboratory's approved methods, local forms and quality-system terminology.
When to use this template
- You need an editable analytical or routine testing workflow that shows analyst, reviewer and quality handoffs without imposing one laboratory standard on every use case.
- You are revising an SOP, training material or audit-ready process map and need the failure paths visible alongside the routine path.
- Several teams own parts of the workflow and need a shared view of the handoffs, evidence and escalation points.
How it works
Set the real roles and records
Replace the example lanes with the people who actually perform Laboratory Coordinator, Analyst / Technician, Reviewer. Add the SOP, form, system or logbook that provides evidence at each handoff.
Define the decision criteria
Write the site-specific rule behind each decision, especially current method selected?, equipment and materials ready? and system suitability or qc acceptable?. Do not leave a result-dependent decision to informal judgement.
Test the exception paths
Walk a recent non-routine case through the hold, clarification, investigation or remediation branches. Change the chart wherever the real response differs from the draft.
Approve and review the procedure
Route the completed process through your document-control and approval process, train the affected roles and review it when methods, systems, responsibilities or risks change.
Frequently asked questions
What does this laboratory testing process flowchart cover?
The template separates preparation and readiness from the test itself, then routes failed quality checks into investigation instead of treating a result as reportable by default. It includes the decision points and exception routes needed to prevent a failed check or unclear handoff from being treated as routine work.
Can this template be used in a regulated laboratory?
It is an editable starting point, not a compliance claim. Regulated and accredited laboratories should align the roles, records, acceptance criteria, method controls and approvals to their applicable framework and approved quality system.
How should we adapt the workflow?
Start with the actual records and roles used at the site, define the criteria behind each decision, then test the exception branches against a recent real case. Remove steps that do not occur and add required local controls before approval.
Where this process fits
In most operations this process follows Laboratory sample management process flowchart and hands off to Laboratory data review process flowchart.
Comes before
- Laboratory sample management process flowchart — A laboratory sample management workflow for receipt, document checks, identification, acceptance, registration, storage and routing to testing or a controlled exception path.
Comes after
- Laboratory data review process flowchart — A laboratory data review workflow for completeness and traceability checks, calculation verification, discrepancy assessment, corrections, reviewer approval and a controlled result record.
- Out-of-specification (OOS) investigation process — An OOS investigation workflow for securing data and samples, initial laboratory review, assignable-cause assessment, validity decisions, expanded investigation, impact assessment and CAPA.
