Laboratory data review process flowchart
A laboratory data review workflow for completeness and traceability checks, calculation verification, discrepancy assessment, corrections, reviewer approval and a controlled result record.
What the laboratory data review process is
The workflow distinguishes ordinary reviewer checks from a discrepancy that needs correction, investigation or escalation, preserving the original record and its rationale. It is deliberately a starting point: adapt the roles, criteria, records and escalation thresholds to the services and risks your laboratory actually manages.
The meaningful branches are not footnotes. Record complete and attributable?, Calculations and result transcription verified? and Review supports reported result? decide whether routine work can proceed or whether the laboratory must hold, clarify, investigate or escalate the work.
This template does not establish compliance with any standard or regulation. Confirm the procedure, safety controls, authorization roles and retention requirements that apply at your site before making it effective.
What this flowchart covers
In this template
- Five stages from prepare record through approve across the roles that own this workflow.
- A documented positive and negative path for record complete and attributable?, so an exception stays visible rather than disappearing from the flow.
- The calculations and result transcription verified? gate before routine work continues, with a hold, investigation or remediation path where it does not.
- A final review supports reported result? decision that routes both outcomes through controlled records and closure.
- Editable swimlanes and labels that can be aligned with the laboratory's approved methods, local forms and quality-system terminology.
When to use this template
- You need a review workflow for paper, electronic or hybrid laboratory records that separates analyst preparation, reviewer assessment and quality approval where appropriate.
- You are revising an SOP, training material or audit-ready process map and need the failure paths visible alongside the routine path.
- Several teams own parts of the workflow and need a shared view of the handoffs, evidence and escalation points.
How it works
Set the real roles and records
Replace the example lanes with the people who actually perform Analyst / Technician, Reviewer, Quality Assurance. Add the SOP, form, system or logbook that provides evidence at each handoff.
Define the decision criteria
Write the site-specific rule behind each decision, especially record complete and attributable?, calculations and result transcription verified? and review supports reported result?. Do not leave a result-dependent decision to informal judgement.
Test the exception paths
Walk a recent non-routine case through the hold, clarification, investigation or remediation branches. Change the chart wherever the real response differs from the draft.
Approve and review the procedure
Route the completed process through your document-control and approval process, train the affected roles and review it when methods, systems, responsibilities or risks change.
Frequently asked questions
What does this laboratory data review process flowchart cover?
The workflow distinguishes ordinary reviewer checks from a discrepancy that needs correction, investigation or escalation, preserving the original record and its rationale. It includes the decision points and exception routes needed to prevent a failed check or unclear handoff from being treated as routine work.
Can this template be used in a regulated laboratory?
It is an editable starting point, not a compliance claim. Regulated and accredited laboratories should align the roles, records, acceptance criteria, method controls and approvals to their applicable framework and approved quality system.
How should we adapt the workflow?
Start with the actual records and roles used at the site, define the criteria behind each decision, then test the exception branches against a recent real case. Remove steps that do not occur and add required local controls before approval.
Where this process fits
In most operations this process follows Laboratory testing process flowchart and hands off to Laboratory notebook review process flowchart.
It is one step in Laboratory data review.
Step 1: Laboratory data review process flowchart You are here
A laboratory data review workflow for completeness and traceability checks, calculation verification, discrepancy assessment, corrections, reviewer approval and a controlled result record.
Step 2: Laboratory notebook review process flowchart
A laboratory notebook review process chart for screening entries, checking calculations and attachments, resolving queries, escalating record concerns and signing the review.