Raw material testing process flowchart

An editable raw material testing workflow for confirming material identity and records, planning required checks, preparing samples and controls, resolving invalid work and providing reviewed status input.

Use this template

What the raw material testing process is

The chart keeps material identity and the relevant specification record visible before preparation starts. It then separates test execution from the review and status-input handoff, so laboratory testing is not confused with the wider release or disposition decision.

Incomplete information or an invalid check moves through a hold, investigation and repeat route. The template does not assume that every raw material needs the same checks or that one result determines a universal disposition.

What this flowchart covers

In this template

  • Material-record confirmation, sample preparation, required checks and reviewed status input.
  • A hold route for a missing material identity or specification record.
  • An investigation and repeat path for an incomplete or invalid check.
  • A handoff that provides reviewed testing input without claiming to release material.

When to use this template

  • You need a testing process for incoming or stored raw-material samples.
  • The laboratory must receive the right material identity and record before it plans work.
  • You want to distinguish laboratory results from the separate material-status decision.

How it works

  1. Link identity to the material record

    Name the system, request or controlled document that confirms the material identity and applicable specification. Define who resolves an incomplete or conflicting record.

  2. List checks by material class

    Add the checks, controls and records that apply to each material class in your operation. Do not imply that a single analytical or microbiological panel applies to every material.

  3. Set the reviewed handoff

    Specify who receives the reviewed laboratory result, what it means in your material-status process and where a question about release or disposition is handled.

Frequently asked questions

What is included in a raw material testing process?

The workflow confirms material identity and records, plans the required checks, prepares the sample and controls, completes and reviews the work, investigates a gap where needed, then sends reviewed status input to the responsible process.

Does raw material testing release a material for use?

Not by itself. This chart ends with reviewed laboratory input. Your quality, warehouse or material-disposition procedure should define who makes and records the release, hold or rejection decision.

What should happen when a required check is invalid?

Investigate the issue, preserve the relevant evidence and repeat an approved check or arrange qualified support as appropriate. The route should be documented rather than treated as an unrecorded replacement result.

Part of

QueryChart features for this process

Use this template

More in Laboratory SOP & process templates

Browse all Laboratory SOP & process templates

Raw material testing process: Confirm material → Prepare → Test → Review
Raw material testing process flowchart