Production Time Loss Sankey Diagram: Editable Template

Break planned production hours down into downtime causes, slow running, small stops and quality loss, ending in hours of good output. Replace the hours with your own line data.

Instead of units, this Sankey follows time. Planned production hours split into the categories of loss that eat them, so the biggest time thieves are the widest ribbons.

A thousand planned hours split into run time and downtime. Downtime is broken into breakdowns, changeovers, shortages and overrun. Run time itself loses hours to slow running and small stops, and quality problems take some of what is left.

The result is hours of good output. It is related to measures such as OEE but is not one: use the diagram to see where hours go, and compute any standard measure the standard's way. The hours are invented.

How to read this diagram

  • Of 1,000 planned hours, 650 (65%) produce good output in this example.
  • Downtime is the largest loss at 220 hours; breakdowns are 41% of it.
  • Slow running and small stops together cost 90 hours, as much as breakdowns.
  • Quality loss costs 40 hours, less than slow running (60) and more than small stops (30).

The data behind it

Invented figures for illustration. Not data about any real business.

Production Time Loss Sankey Diagram: Editable Template (hours)
FromToAmount (hours)
Planned production timeRun time780
Planned production timeDowntime220
DowntimeBreakdowns90
DowntimeChangeovers70
DowntimeMaterial shortages40
DowntimeMaintenance overrun20
Run timeProductive run time690
Run timeSlow running60
Run timeSmall stops30
Productive run timeGood output time650
Productive run timeQuality loss40

The same data as CSV

source,target,value
Planned production time,Run time,780
Planned production time,Downtime,220
Downtime,Breakdowns,90
Downtime,Changeovers,70
Downtime,Material shortages,40
Downtime,Maintenance overrun,20
Run time,Productive run time,690
Run time,Slow running,60
Run time,Small stops,30
Productive run time,Good output time,650
Productive run time,Quality loss,40

How it works

  1. Fix the planned time

    Use the hours the line was scheduled to run in the period.

  2. Classify the losses

    Assign every lost hour to one cause using a short, mutually exclusive list.

  3. Enter the flows

    Type planned time into run time and downtime, then each cause.

  4. Check the total

    The sinks, plus the lost hours, must add up to the planned hours.

Frequently asked questions

Is this the same as OEE?

No. OEE is a specific ratio. This diagram shows where the hours go and can sit beside an OEE figure that you calculate separately.

Why start from planned time?

It is the fixed total that every loss comes out of, which keeps the diagram balanced.

Edit this production loss Sankey

Open the example as your own chart and enter your hours by loss category.

Edit this production loss Sankey