Manufacturing Yield Sankey Diagram: Editable Template
Follow a batch of units from raw input through each production stage to good output, rework, downgraded product and scrap, and see which stage loses the most. Replace the counts.
A yield Sankey follows units through the stages of a line and draws every loss as its own ribbon: scrap at each stage, rework that is recovered or not, and product downgraded at the end.
Ten thousand units enter cutting. Some are scrapped there, the rest go to machining, where units can pass, be reworked or be scrapped, and so on to a final inspection that grades what is left.
Rework is drawn as its own node, so you can see how much of it is recovered. The counts are invented, and they follow one batch so that every unit is counted once.
How to read this diagram
- 10,000 units in, 8,800 good out: an overall yield of 88%.
- Total scrap is 900 units (9%): 400 at cutting, 300 at machining including rework, and 200 at inspection.
- Machining and its rework step scrap 300 units, a third of all scrap.
- Of 250 units sent to rework, 200 (80%) are recovered.
The data behind it
Invented figures for illustration. Not data about any real business.
| From | To | Amount (units) |
|---|---|---|
| Raw input | Cutting | 10000 |
| Cutting | Machining | 9600 |
| Cutting | Scrap | 400 |
| Machining | Assembly | 9100 |
| Machining | Rework | 250 |
| Machining | Scrap | 250 |
| Rework | Assembly | 200 |
| Rework | Scrap | 50 |
| Assembly | Final inspection | 9300 |
| Final inspection | Good output | 8800 |
| Final inspection | Downgraded (B-grade) | 300 |
| Final inspection | Scrap | 200 |
The same data as CSV
source,target,value
Raw input,Cutting,10000
Cutting,Machining,9600
Cutting,Scrap,400
Machining,Assembly,9100
Machining,Rework,250
Machining,Scrap,250
Rework,Assembly,200
Rework,Scrap,50
Assembly,Final inspection,9300
Final inspection,Good output,8800
Final inspection,Downgraded (B-grade),300
Final inspection,Scrap,200How it works
List the stages in order
Include rework and inspection as stages if units can leave there.
Count units per stage for one batch
Record units in, units passed on, and units scrapped or reworked.
Enter the flows
Type each stage's passed-on units and each loss to its own node.
Check units in and out
Good output plus downgraded plus scrap should equal the raw input.
Frequently asked questions
Can I use weight or cost instead of units?
Yes. Choose one unit and keep it throughout, such as kilograms of material or euros of cost.
Does this replace yield reporting?
No. It presents numbers you collect elsewhere so the stages that lose most are easy to see.
Edit this yield Sankey
Open the example as your own chart and enter your unit counts by stage.