QueryChart vs UiPath Task Capture
Compare maintained process maps and visual SOPs with captured desktop tasks. QueryChart and Task Capture overlap in documentation but begin with different inputs.
Compare maintained process maps and visual SOPs with captured desktop tasks. QueryChart and Task Capture overlap in documentation but begin with different inputs.
The short version
- Choose the output before choosing the platform.
- A recorded task still needs review of roles, exceptions and business rules.
- QueryChart documents workflows; it does not run robots or record desktop tasks.
Continue with process documentation
- UiPath Task Capture alternative
- Process mapping without RPA
- Create a visual SOP
- Version control for process documentation
- Map before automation
- SOP review and approval template
- Task Capture alternatives by documentation need
- Create a swimlane diagram
- CAPA workflow example
- Change control example
- Map structured CSV steps
Choose by the required deliverable. Task Capture is one UiPath product; automation and mining require other ecosystem products. Product information checked 2026-09-30.
| Aspect | QueryChart | UiPath Task Capture / ecosystem |
|---|---|---|
| Manual mapping and editable diagrams | Build and edit process steps, connectors and swimlanes. | Task Capture offers Diagram Builder as well as recording. |
| SOP and process documentation | Maintain a visual workflow with step details and SOP view. | Task Capture generates process documentation and Word exports. |
| Review and version history | Chart versions and approval workflows; check plan availability for your team. | Verify collaboration and governance in the specific UiPath product and license; do not infer platform-wide capabilities from Task Capture. |
| Record actions and screenshots | No task recorder or automatic screenshot capture. | Task Capture supports recording and captured screenshots. |
| Mining, RPA and orchestration | No event-log process mining, task mining, robot deployment or automation orchestration. | Available through the broader UiPath ecosystem, rather than Task Capture alone. |
| Best fit | Teams maintaining shared process maps and visual SOPs. | Captured desktop task evidence or a broader automation program. |
Explore an editable process documentation example
Inspect the roles and decision paths, then open the example to adapt it to your own process. This is a process map, not a task recording.
Define the work
The example starts with “Document need or change identified”. Add “Raise a document change request” as a concrete action rather than a screen interaction.
Connect outcomes and exceptions
At “Carry out technical review”, inspect the outcome destinations and preserve the rejection or missing-evidence route alongside the normal path.
Check decisions and handoffs
Inspect every route in the complete map, then confirm that “Document withdrawn and retired” is the intended finished outcome and the responsible owner is clear.
Start with the evidence and the required output
QueryChart begins with described or imported process information and produces a workflow people can edit and maintain. Task Capture can begin with a manually built diagram or a recorded desktop task. Choose the input that matches your evidence and the artifact that matches ongoing use.
Task Capture workflow: perform a task, record actions and screenshots, edit the captured documentation, then share it or use it in the UiPath development workflow. QueryChart workflow: describe or import the process, edit the map, review it, maintain chart versions and share the visual SOP.
Test the same process in both tools: one decision, one exception, two owner roles and a later revision. Check screenshot requirements, reviewer access, version behavior and licensing. Neither a richer platform nor a smaller tool is automatically the better fit.
How it works
Define the process boundary
Name the trigger, finished outcome and owner. Separate business steps from individual clicks so the map stays useful after a screen changes.
Map steps, decisions and roles
Write one action per row, label each decision outcome and assign an owner lane. Include rejection, rework and escalation paths.
Review against real work
Ask a person who performs the task to walk the normal path and one exception. Add instructions and evidence references where the chart alone is insufficient.
Approve and maintain the artifact
Use chart versions and your configured review/approval workflow. Share the agreed version and assign a next review date. Verify plan availability before relying on a team feature.
Try QueryChart free
Map, review and share the process your team needs to maintain.
Related guides
Sources
Frequently asked questions
Does QueryChart record user actions like Task Capture?
No. Create or import process information and review the editable workflow. QueryChart does not capture clicks or screenshots as you work.
Can QueryChart replace UiPath automation?
No. Keep an automation platform when you need RPA, automation deployment, orchestration, process mining or task mining.
How should a team check the map before using it as an SOP?
Walk through a real case and an exception with the process owner. Verify the roles, branch destinations and supporting instructions, then retain and share the reviewed chart version.