Sample log-in process flowchart

An editable sample log-in workflow for matching requests to accepted samples, creating an accession record, verifying traceability, correcting entry discrepancies and assigning routing and storage status.

Use this template

What the sample log-in process is

This chart maps the accession step after a sample is accepted. It compares the request with the physical sample, creates the log-in record, checks that record for traceability and assigns routing or storage status.

An unclear request-to-sample match or incomplete accession record is routed to a controlled hold and correction path. That makes a log-in exception visible before downstream testing or storage relies on the record.

This template does not establish compliance with any standard or regulation. Confirm the accession fields, system controls, approval roles and record-amendment process that apply at your site before making it effective.

What this flowchart covers

In this template

  • Four stages from request matching through completed sample log-in.
  • A labelled request-and-sample match decision before accessioning.
  • A second gate for confirming that the accession record is complete and traceable.
  • A hold and amendment route for mismatches or entry errors.
  • Editable lanes for reception, coordination and quality oversight.

When to use this template

  • You need a workflow between receipt acceptance and assignment to testing or storage.
  • You are implementing or reviewing an accession, LIMS or sample-register process.
  • You want entry corrections and source discrepancies to have a visible owner.

How it works

  1. Map the accession record

    Replace the generic log-in record with the LIMS screen, sample register or controlled form your team uses. Name the fields that link request, sample and status.

  2. Define matching rules

    Specify how the receiving team compares a request to a physical sample and which differences require a hold rather than a routine correction.

  3. Set amendment controls

    Describe who can correct an accession entry, what rationale is required and how an original entry remains traceable in your system.

  4. Test the routing handoff

    Walk an accepted sample through log-in to testing and storage. Confirm the next team can identify the sample, status and location from the final record.

Frequently asked questions

What is a sample log-in process?

It is the accession workflow that creates a traceable laboratory record for an accepted sample. The process connects the request and physical sample, verifies the record and assigns the sample's next routing or storage status.

What happens when the request and sample do not match?

Hold the accession in the status your procedure defines, investigate the difference with the source owner and record the resolution. Do not create a routine accession by guessing which request belongs to the sample.

Why does a sample log-in record need a correction route?

An entry can be incomplete or inconsistent even when the sample is physically present. A controlled correction route preserves what changed and why before downstream work relies on the record.

Where this process fits

In most operations this process follows Sample receipt process flowchart and hands off to Laboratory worklist process flowchart.

It is one step in Sample lifecycle.

  1. Step 1: Sample collection process flowchart

  2. Step 2: Sample transport process flowchart

  3. Step 3: Sample receipt process flowchart

    A laboratory sample receipt process for delivery checks, documentation review, sample identification, condition assessment, acceptance, accessioning and exception handling.

  4. Step 4: Sample log-in process flowchart You are here

    An editable sample log-in workflow for matching requests to accepted samples, creating an accession record, verifying traceability, correcting entry discrepancies and assigning routing and storage status.

  5. Step 5: Sample labeling process flowchart

    An editable sample labeling workflow for using source records, creating traceable labels, checking label-to-sample matches, correcting discrepancies and recording label status.

  6. Step 6: Sample storage process flowchart

  7. Step 7: Sample retention process flowchart

  8. Step 8: Sample disposal process flowchart

Part of

QueryChart features for this process

Use this template

More in Laboratory SOP & process templates

Browse all Laboratory SOP & process templates

Sample log-in process: Match → Accession → Verify → Route
Sample log-in process flowchart