Nursery Team Structure: Roles and Reporting Lines
A nursery team structure usually puts a nursery manager over a deputy, who leads the room leaders for the baby, toddler and pre-school rooms. Practitioners, assistants and an apprentice sit in each room, and support roles for special needs, safeguarding, food, admin and cleaning sit beside them.
Nursery Team Structure: Roles and Reporting Lines
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
A nursery (in the US a child care center or preschool) is organised around rooms. Each room is a small team with its own leader, and the rest of the setting exists to keep those rooms running. The chart on this page follows that shape.
This is an illustrative, role-based example and not a prescribed structure. Sizes and titles vary by setting, country and budget, and some settings are run by one owner who fills several of these boxes.
It shows the nursery manager as the top role, using the UK term. In the US the same job is often called the center director or preschool director, and a room leader may be a lead teacher.
How a nursery team is organized
The Nursery manager is the top role. Below sit the Deputy manager, the Special educational needs coordinator, the Designated safeguarding lead, the Cook, the Administrator and the Cleaner.
The Deputy manager carries the day to day rooms. Three room leaders report to the deputy: Baby room leader, Toddler room leader and Pre-school room leader. Each leader has an Early years practitioner and a Nursery assistant for that room, and the Apprentice works in the pre-school room under its leader.
The Special educational needs coordinator and the Designated safeguarding lead are drawn as roles with their own line to the manager. In many settings the manager or deputy holds one or both of these roles, so merge the boxes if that is how you work. The chart names the roles only. What each person must do is set by the rules where you operate.
Cook and Kitchen assistant run the food side. Administrator handles enquiries, records and invoices. Cleaner keeps the building ready. A small nursery may have one room with one leader and no deputy at all. A larger group can add a room for each age band or a second deputy.
Lead role
Nursery manager
Example top role — Owns the setting as a whole, including staffing, the building and the link with families.
Deputy manager
Example operational lead — Runs the rooms day to day and steps in when the manager is away.
Toddler room leader
Example room lead — Leads one room team and plans the room routine with the practitioners.
Special educational needs coordinator
Example specialist role — Supports staff and families when a child needs extra help. Check the duties that apply where you operate.
Designated safeguarding lead
Example specialist role — The named point of contact for child welfare concerns. Often held by the manager or deputy.
How to adapt this structure
Rooms are the unit of the chart. A parent, an inspector or a new starter can see who leads the baby room without reading a long list.
The deputy sits between the manager and the room leaders, so the manager is free for families, staffing and the building.
Special needs and safeguarding are drawn as named roles. Naming them stops them from being assumed to belong to whoever is in the room that day.
Design tradeoffs
- Each room has one leader, so room routines and handovers stay consistent.
- Staff who cover between rooms report to one leader and work for another, which needs clear handover.
- A deputy gives the manager a second pair of hands.
- In a small setting the deputy is also a room leader, so two jobs share one box.
- Specialist roles have a visible place.
- When the manager holds several of them the chart looks fuller than the day feels.
What this chart shows
- Three room leaders share one line to the deputy, which keeps the chart to four levels.
- The apprentice reports to the pre-school room leader, because an apprentice is placed in one room to learn.
- Special educational needs coordinator and Designated safeguarding lead are roles and not levels, so a person can hold either alongside another job.
- Titles differ by country. Preschool director, lead teacher and teaching assistant are common US equivalents.
Related process templates
Frequently asked questions
Who is in charge of a nursery?
The nursery manager is usually the top role, with a deputy beneath them. In the US the same job is often called the center director or preschool director. In a small setting an owner may hold the role directly, so the chart shows the job and not the person.
What does a nursery room leader do?
A room leader leads the team in one room, such as babies, toddlers or pre-school. They plan the room routine with the practitioners and assistants, act as the link with that room's families and report to the deputy or manager. Exact duties vary by setting.
Does a nursery need a deputy manager?
Many do, since the deputy runs the rooms while the manager handles families, staffing and the building. A very small setting may have no deputy and give a senior room leader that cover. Check the rules where you operate on who must be in charge at any time.
Where do special needs and safeguarding roles sit?
Both are shown as named roles with their own line to the manager, and in many nurseries the manager or deputy holds them. Draw them where your setting places them. The chart names the roles only and does not set out their duties.
Use this org chart template
Open and edit this nursery team structure in QueryChart.