Food Bank Network Organizational Chart
This editable example shows a central hub that serves several local food banks, with shared stock and funding at the centre and day-to-day running left to each local manager.
Food Bank Network Organizational Chart
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
Some food banks work alone. Others join a network in which a small central team buys, stores and funds on behalf of many local sites. This illustrative chart draws the second kind, with a Network Director at the top and local food bank managers at the edges.
The chart is a role-based sketch and describes no real network. It shows where a shared function sits and where a local decision stays local, because that boundary is the question most networks argue about.
A network chart differs from a single food bank chart in what travels between levels. Donated stock with dates moves from the hub warehouse to the sites, funding reports move from the sites to the hub, and training moves in both directions.
How the network is organized
The Network Director leads the hub and has six direct reports. Four are shared functions: the Shared Warehouse Manager, the Funding and Grants Lead, the Quality and Training Lead and the Network Communications and Data Officer. Two are Area Coordinators who look after groups of local sites.
Local Food Bank Managers report to an Area Coordinator and run their own sessions, volunteers and clients. The hub does not hand out parcels. It supplies stock, funding, training and a common way of recording visits, and each local manager decides how to use them on the ground.
A small network can drop the Area Coordinator layer and let local managers report straight to the director. A large one can add coordinators for each area, a second warehouse lead for another depot and a dedicated safeguarding or partnerships role at the hub. The satellite hub plan at /templates/food-bank-satellite-hub-gantt-chart shows how a new site might be brought into a network like this one.
Lead role
Network Director
Example hub leader — Replace this title with whoever leads the central team in your network.
Shared Warehouse Manager
Example shared stock owner — Owns stock that is held centrally and sent on to sites.
Quality and Training Lead
Example standards owner — Keeps practice similar from one site to the next.
How to adapt this structure
Shared functions sit once at the hub, so each local site does not need its own grant writer or transport planner.
Local managers keep their clients and volunteers close, which preserves the local character that makes a community food bank trusted.
Area Coordinators give the director a manageable number of direct reports as the network adds sites.
Design tradeoffs
- A shared warehouse spreads donated stock across sites.
- Sites depend on hub transport and timing, which a local manager cannot control.
- Shared funding work lets small sites benefit from larger applications.
- Money raised centrally has to be allocated, and that conversation needs an owner.
- A training lead gives every site the same induction.
- Common practice can feel heavy to a small site that already works well.
What this chart shows
- A food bank network holds donated stock with dates in a central store and in each site, so rotation matters at both levels.
- The root role is Network Director, with four shared functions and two area coordinators on the first layer.
- Local Food Bank Managers are leads in their own right and run sessions that the hub never sees directly.
- The Practice Review Visitor role is a peer visit to a site, which keeps quality checks friendly.
Related process templates
Frequently asked questions
Is this how a food bank network has to be organized?
No. It is an illustrative chart. Move roles, add layers or remove them to match your network.
Do local managers need a coordinator above them?
Only if the director would otherwise have too many direct reports. Many small networks skip the layer.
Where do I show a shared volunteer pool?
Add a role under the Quality and Training Lead or draw a separate volunteer chart. The volunteer guide at /guides/how-to-organize-a-volunteer-team helps with that side.
Which processes does the hub own?
Usually stock movement between depot and sites, and funder reporting. The stock rotation flowchart shows the site end of the same story.
Use this org chart template
Open and edit this food bank network org chart in QueryChart.