Brewery Team Structure
A brewery organizational structure usually places a Head brewer over brewing and the cellar, with packaging, quality, sales, logistics and a taproom as separate branches under the owner or managing director. This editable chart draws those branches and the roles in each.
Brewery Team Structure
Illustrative, editable reporting structure. Adapt roles and lines to your organization.
About this department template
A brewery makes beer in batches and sells it in several forms: kegs for pubs, cans and bottles for shops, and pints in its own taproom. Each form has its own team, and all of them depend on what the brewhouse and cellar produce.
This chart is an illustrative, role-based example and not a prescribed structure. It uses common brewery titles and does not describe any particular brewery. Head brewer is shown first, and the same role is sometimes called Brewmaster. Cellarman may be written Cellar operator in other places.
It differs from a food plant chart because quality sits alongside brewing rather than inside a production line, and because many breweries also run a bar. The taproom is a real branch with its own staff.
How a brewery team is organized
The Brewery owner or Managing director is the top role. Eight branches sit below: Head brewer, Packaging lead, Quality manager, Maintenance engineer, Sales manager, Logistics and delivery lead, Taproom manager and Finance and administration manager.
The Head brewer leads the making of the beer. The Brewhouse operator runs the brew day and the Cellarman looks after fermentation and conditioning with a Cellar assistant. The Assistant brewer shares recipe and planning work. The Packaging lead takes finished beer into cans, bottles and kegs with operators and packaging hands. Quality manager and the Lab technician check beer at set points and report to the Head brewer on anything that holds a batch.
The commercial side starts with the Sales manager and two account managers, one for pubs and bars and one for shops. The Logistics and delivery lead runs the warehouse and drivers. The Taproom manager leads a Bar supervisor and bar staff on weekday and weekend rotas. The Head brewer and the Quality manager decide together whether a batch goes out, which is a joint line that the tree does not draw. A small brewery may have one person who brews, packs and delivers, and a larger one adds a shift system.
Lead role
Brewery owner / Managing director
Example top role — Replace with the person who owns brewery decisions, whether an owner, founder or managing director.
Head brewer
Example function lead — Owns recipes, brew plans and the beer that leaves the cellar.
Packaging lead
Example function lead — Owns the cans, bottles and kegs and the packaging schedule.
Quality manager
Example function lead — Owns the checks and records that say a batch is ready to go.
Taproom manager
Example function lead — Owns the bar, the rota and the visitor experience.
How to adapt this structure
Brewing, packaging and quality are three separate branches. A packaging delay or a quality hold does not land on the person who is brewing the next batch.
The taproom has its own manager. Weekend demand is handled there without pulling brewhouse staff away from the beer.
Sales and logistics sit side by side. What was sold and what can be sent are discussed at the same table every week.
Design tradeoffs
- Quality is a branch of its own.
- A small brewery may not have the people for it, and then the Head brewer carries the checks as well.
- Packaging has one lead for cans, bottles and kegs.
- Seasonal peaks stretch the same team, so planning with the Head brewer matters.
- The taproom is separated from production.
- Bar staff may feel distant from the beer unless brewers join tastings and staff briefings.
What this chart shows
- Account manager boxes are split by On-trade and Retail because pubs and shops buy in different ways.
- The Cellarman sits under the Head brewer because fermentation timing drives the whole schedule.
- Bar staff are shown as two rotas, Weekday and Weekend, since both need clear names for the sheet.
- Maintenance engineer has no reports here, which is common in a small site.
Frequently asked questions
Who does the Head brewer report to in a brewery?
In this example the Head brewer reports to the Brewery owner or Managing director. In a larger group the role may report to an operations director, and in a small craft brewery the owner may brew. Redraw the line to match how your brewery decides.
What is the difference between a Head brewer and a Brewmaster?
The titles overlap and usage varies by country and company. Both name the person who owns recipes and the quality of the beer. Pick the term your team uses, and note the other one in the box if readers need it.
What roles does a small brewery combine?
A small brewery often has an owner who brews, one or two brewers who also pack and deliver, and bar staff for a taproom. Quality checks are usually shared by the brewers. Merge or delete boxes in the chart to fit your size.
Is this the structure a brewery must use?
No. It is an illustrative, role-based example, and titles, team sizes and rules vary by production, country, union and budget. Rename the roles and redraw the lines to match your own brewery.
Use this org chart template
Open and edit this brewery org chart in QueryChart.