How to map a triage and urgency decision

How to map a triage and urgency decision: label every branch, give each urgency level its own path and show the exits when the case cannot be taken. Live veterinary appointment example.

Triage is a decision with more than two outcomes and several ways out. This guide shows how to draw the urgency levels, the questions that choose between them and the exit paths for cases you cannot take.

The short version

  • Screen for danger signs first and give that branch its own fast path.
  • Give every urgency level its own labelled branch, plus one that returns for more detail.
  • Draw the exit for a case you cannot take, including the handover and the call ahead.
  • Make advice to wait a loop with a call-back time and a worse-than-before branch.
  • End every path in the same record step.

One decision, several exits

A triage chart is easy to draw badly. The usual version has one diamond that says urgent or not and two arrows leaving it. Real triage has a first screen for danger signs, a second round of questions for everything else and then an urgency level that sends the case somewhere different each time. Each of those is a decision, and every branch has to be labelled or the chart cannot be used.

The part most charts leave out is the exits. A case that needs to be seen now might not fit the clinic's capacity or equipment, and then it goes to another service. A case advised to wait at home needs a call-back time and a rule for what happens if it gets worse. Both are paths that leave the normal flow and rejoin the record, and without them staff improvise.

So the method is to map in this order. First draw the danger-sign screen and give the yes branch its own path. Second draw the question round and the urgency decision with one labelled branch for every level, including a branch that goes back for more detail. Third draw the exits and the call-back loop. Fourth add the record step where every path ends. Only then add lanes for the caller, reception, nurse and veterinarian.

The example below is an appointment triage process for a veterinary clinic, built in four stages. The chart is an illustration of structure and is not veterinary or legal advice. The signs, urgency levels and time limits belong in your own clinic policy, written into the labels and comments.

From the first call to a booking, advice or handover

A veterinary appointment triage process with a danger-sign screen, an urgency decision and three exit paths.

  1. The danger-sign screen

    The owner calls and reception takes the basic details. The first decision asks whether there are danger signs. Yes sends the owner in at once and readies the emergency bay. A second decision asks whether the clinic can take the case now, and its no branch is already a labelled exit, which is the first sign that exits belong on the chart from the start.

  2. Questions and the urgency decision

    When there are no danger signs, structured questions are asked and the case is reviewed. The urgency decision has three labelled branches: same day, routine and need more detail. The last one is a line back to the questions, and it is what lets the chart show a case that cannot be decided yet.

  3. Same day, routine and the call-back loop

    A same-day case is offered the next slot, and a decision asks whether the owner can attend. If not, home-care advice is given with a call-back time, and at the call-back a decision asks whether the animal is worse. Yes sends it back to the emergency path. No continues to the record. Routine cases are booked with preparation notes.

  4. Exit paths and the roles

    The remaining steps are the examination and treatment, the handover to an out-of-hours or referral service with a call ahead and the record that every path ends in. With the decisions fixed, the lanes for owner, reception, nurse, veterinarian and the other service show where each handoff happens.

How it works

  1. Write the question each decision asks

    List every point where the outcome changes and phrase it as a question that has a clear answer. Add each as a decision with labelled branches before any lanes exist.

  2. Draw the danger-sign screen

    Put the screen first. The yes branch goes to the fast path and the no branch goes to the longer set of questions.

  3. Give each urgency level a branch

    Add one labelled branch for every level the clinic uses. Add a branch that returns to the questions for the case that cannot be decided yet.

  4. Draw the exits

    For every path that can fail, such as no capacity or an owner who cannot attend, draw the exit. Label why the case leaves and what happens next, for example a handover with a call ahead.

  5. Close the advice loop

    Where a case is told to wait, add a call-back step and a decision on whether it is worse. Connect the worse branch back to the urgent path.

  6. Add the record and the lanes

    Send every path to the same record step, then move the steps into lanes. Each lane crossing is a handoff that needs a name and a time.

Mistakes to avoid

  • A single urgent-or-not diamond

    Two branches hide the routine and same-day levels. Draw one branch for each level in use.

  • Unlabelled branches

    An arrow with no label forces the reader to guess. Label every branch from every decision.

  • No exit for a full clinic

    If the chart assumes every case can be taken, staff improvise when one cannot. Draw the handover.

  • Advice with no follow-up

    Home care without a call-back leaves a gap. Add the call-back and the branch for a worse animal.

Map your own triage decision

Open the veterinary triage example as your own chart, change the questions and the urgency levels to match your policy, and then assign the lanes.

Map your own triage decision

Related guides

Frequently asked questions

How do I draw a triage decision on a flowchart?

Use a decision step for each question, label every branch and give each urgency level its own path. Add a branch that returns to the questions for cases that need more detail.

What are exit paths in a triage chart?

They are the routes that leave the normal flow, such as a handover to another service when the clinic cannot take the case. Draw them with their own label and make them end in the same record as every other path.

Where does the patient go after triage?

Into the admission and treatment steps. Read /templates/veterinary-patient-admission-and-consent-process for admission and /guides/how-to-map-a-veterinary-patient-journey for the whole stay.

Does the chart set the clinic's triage rules?

No. It shows structure. The signs, urgency levels and time limits are set by each clinic, so write yours into the labels and comments. It is not veterinary or legal advice.

The template behind this guide

Veterinary appointment triage process flowchart — Veterinary appointment triage process flowchart: red-flag screening, urgency review by the vet, same-day or routine booking, home-care advice with a call-back and a hand-off to out-of-hours care.