How to map a sterilisation cycle

How to map a sterilisation cycle as a loop with a failed-cycle exception path: draw the checks, the return to cleaning and the stop. Live dental instrument example.

A sterilisation cycle is a loop. Instruments that fail a check go back to cleaning, and a failed cycle sends the whole load to quarantine. This guide shows how to draw the loop and its exception path so every failure has somewhere to go.

The short version

  • Draw each check as a decision and label the failing branch.
  • Send each failure back to the right earlier step with a line.
  • Give a failed cycle its own exception path with quarantine and a cause check.
  • Add an exit to every loop, such as stopping the machine and calling for service.
  • Keep a record step on the main path so the evidence of each load is visible.

Draw the way back before the way through

The usual chart of instrument reprocessing is a line: clean, pack, sterilise, store. It describes the day when everything works. The reason to chart the process at all is the other days, when an instrument is still soiled, a pack is damaged or a cycle does not complete. Each of those needs a branch, and most of the branches lead back to an earlier step rather than forward.

That makes the process a set of loops. A still soiled instrument returns to pre-cleaning. A pack found torn or out of date returns to the same place. A failed cycle goes to quarantine, someone looks for the cause and a decision asks whether the fault is fixed. If it is, the load goes back to be cleaned and processed again. If it is not, the machine stops and service is called. That last branch is the exit that stops the loop being endless.

Map it in this order. First draw the main path from used instruments to ready for the next patient. Second, add each check as a decision and label the failing branch. Third, draw the line back to the right earlier step for each failure. Fourth, add the exception path for a failed cycle with its own exit. Only then place the steps into lanes if more than one role is involved.

The example is a dental instrument decontamination process in QueryChart, built in five stages. It illustrates structure only. Methods, checks, records and schedules are set by manufacturer instructions, local rules and professional guidance, so build the real chart from your own written procedures. It is not dental, medical or legal advice.

From used instruments to ready for the next patient

An instrument decontamination process with a cleaning check, a cycle check and a failed-cycle exception path.

  1. Transport, pre-clean and the machine choice

    Used instruments are placed in a closed tray and pre-cleaned. A decision asks whether the washer-disinfector is available and working. Yes runs the machine cycle and no uses the written manual method. Two branches reach the same next step, so the main path stays one line.

  2. The cleaning check and its loop

    A decision asks whether the instruments are clean and undamaged. Still soiled sends them back to pre-cleaning, which is the first loop. Damaged withdraws the instrument and ends that path. Clean instruments are wrapped and labelled for the steriliser.

  3. The steriliser cycle check

    The load is placed in the steriliser and the cycle starts. A decision then asks whether the cycle completed and the indicators passed. Yes continues to the record. No is the start of the exception path, which the next stage draws in full.

  4. The failed-cycle exception path

    A failed cycle sends the load to quarantine while someone looks for the cause. A decision asks whether the fault is found and fixed. Yes returns the load to pre-cleaning so it is processed again. No stops use of the steriliser and calls for service, and that is the exit that ends the loop.

  5. The record and storage check

    A passed load is recorded and stored in a clean closed area. A last decision asks whether the pack is intact and in date, and a no returns it to pre-cleaning. With the loops fixed, lanes show who holds the instruments at each point and where a failed load waits.

How it works

  1. Draw the main path

    Connect the steps from used instruments to ready for the next patient. Keep it plain. This is the day when every check passes.

  2. Turn each check into a decision

    Add a decision wherever someone looks and judges, such as clean and undamaged, cycle passed or pack intact. Label the passing and failing branches in words.

  3. Send each failure back to the right step

    Draw a line from every failing branch to the earlier step that deals with it. A soiled instrument goes to pre-cleaning, and a failed load goes to quarantine first.

  4. Draw the failed-cycle exception path

    Add quarantine, a cause check and a decision on whether the fault is fixed. Yes returns to the start of cleaning. No leads to stopping the machine and calling for service.

  5. Give every loop an exit

    Check that each loop has a way out other than success. Without one the chart claims a faulty machine will be retried forever.

  6. Add the record and assign lanes

    Keep a load record on the main path, then place steps in lanes for the roles involved. Look at the crossings to see where a quarantined load could be forgotten.

Mistakes to avoid

  • Charting only the good day

    A straight line hides every failure. Add the branches that appear when a check is not passed.

  • Loops that go to the wrong step

    A failed load that returns straight to the steriliser skips cleaning. Check where each failing branch really rejoins.

  • A loop with no exit

    If a failed cycle can only return to the start, the chart never says when to stop the machine. Draw the service branch.

  • Burying the record

    A load record that is only a note in a comment is easy to miss. Make it a step on the main path.

Map your own sterilisation cycle

Open the instrument decontamination example as your own chart, change the checks to match your written procedure and then assign the lanes.

Map your own sterilisation cycle

Related guides

Frequently asked questions

How do I show a retry on a flowchart?

As a line from the failing branch back to an earlier step. Put a decision before it that asks whether the cause is fixed, and give the other branch an exit such as stopping and calling for service.

Should a failed cycle be a separate chart?

Usually not. Keeping it on the same chart shows exactly where in the process the failure happens and where the load goes next. If the chart grows too large, move the exception path to a linked chart.

Where do the other dental processes fit?

The decontamination chart supports every appointment type. For the visit that uses the instruments read /templates/dental-new-patient-examination-process, and for the visit pattern read /guides/how-to-map-a-dental-patient-visit. For recurring visits read /templates/dental-recall-and-hygiene-visit-process.

Is the chart a statement of the required method?

No. Methods, checks, records and schedules are set by manufacturer instructions, local rules and professional guidance. The chart shows a structure; put your own requirements in the labels and comments.