How to handle additional work approval in a workshop

How to map additional work approval in a workshop: draw the no reply loop and the declined work record first. Live example from extra work found to a job card ready for handover.

Extra work found in the middle of a job pauses the job until the customer answers. Draw the no reply loop and the declined work record first, and the quote, the parts check and the handoffs follow.

The short version

  • Pause the item and keep evidence such as photos and measurements before quoting.
  • Separate safety related findings from advisory items so urgency is visible.
  • The customer decision has three exits: approve, decline and no reply.
  • Draw no reply as a loop that notes each attempt and returns to the decision.
  • Record declined work on the vehicle history so handover shows what was refused.

A pause with three possible answers

A technician finds something the booking did not cover, and the job stops. What happens next depends on a single question: does the customer approve the extra work? Most charts draw one arrow for yes and forget the others. In practice there are three answers. The customer approves, the customer declines, or the customer does not reply at all. Each one leads somewhere different, and the third is the one that holds the workshop bay.

No reply is a loop. The advisor calls again, notes each attempt and returns to the same question. A chart without that loop shows a decision that always resolves, when in reality the car sits on the lift while the call goes to voicemail. Declined work is the other path that is easy to lose. It should be recorded on the vehicle history, so that the next visit and the handover both show what was advised and refused.

So the method is to map in this order. First, separate findings that affect safe use of the vehicle from those that can wait, because that decides how fast the advisor must act. Second, draw the quote and the three way customer decision with the no reply loop. Third, record declined work before anything else happens to it. Fourth, draw the approved path: the parts check, a new finish time when parts are late, and the update to the job card and bay. Only then add the lanes.

The example below is a workshop additional work authorisation process in QueryChart, built in four stages. Authorisation rules, record keeping and customer consent requirements differ by country and by workshop, so treat the chart as a structure to adapt against your own procedures rather than a statement of what any law or manufacturer requires.

From extra work found to a job card ready for handover

A workshop additional work authorisation process with an urgency check, a no reply loop and a declined work record.

  1. Finding the extra work

    The process starts when extra work is found during the inspection. The technician pauses the item, notes what was found and takes photos and measurements as evidence. A decision asks whether the finding affects safe use of the vehicle. If it does, it is flagged as urgent and the advisor is told straight away. If not, it is added to the advisory list for the quote.

  2. The quote and the customer decision

    The advisor prices labour and parts and sends the quote with photos by phone, text or email. The decision asks whether the customer approves the extra work and has three branches: Yes, Declines and No reply. No reply leads to "Call again and note each attempt" and returns to the decision, which is the loop. Declines goes to recording the declined work on the vehicle history.

  3. Parts and the approved path

    Approval leads to a parts stock and delivery check. A decision asks whether parts are in stock or due today. If not, a new finish time is agreed with the customer. The job card and courtesy car loan are updated, the bay and technician hours are rescheduled, and the approved extra work is carried out.

  4. Closing and the roles

    Declined work rejoins the main job, which is completed as the original work only. Both paths end at "Job card shows approved and declined work for handover". The lanes for technician, service advisor, customer, parts counter and workshop controller show where each handoff happens, most often at the quote and at the parts check.

How it works

  1. Pause and capture evidence

    Start with the finding. Add a step that pauses the item and a document step for photos and measurements, so the quote rests on something the customer can see.

  2. Split urgent from advisory

    Add a decision on whether the finding affects safe use of the vehicle. Route urgent items to an immediate message to the advisor and the rest to an advisory list.

  3. Draw the quote and the three way decision

    Add the pricing step, the quote step and a decision with the branches Yes, Declines and No reply. Label each branch with the customer's answer.

  4. Close the no reply loop

    Connect No reply to a step that records each call attempt and return it to the same decision. Add your own rule for how many attempts to make in a comment, taken from your procedure.

  5. Record declined work

    Connect Declines to a step that records the declined work on the vehicle history, then to completing the original work only.

  6. Draw the approved path and assign lanes

    Add the parts check, the new finish time, the job card update and the rescheduled bay. Then move the steps into lanes and look at each lane crossing for waiting time.

Mistakes to avoid

  • Treating silence as approval

    A customer who has not replied has not approved. Draw No reply as its own branch with its own loop.

  • Losing the declined work

    If declined work is not recorded, the next visit starts from nothing. Give it a step on the vehicle history.

  • Quoting without evidence

    A quote with no photos or measurements invites a second call. Capture evidence before pricing.

  • Ignoring the bay

    Approved extra work changes the finish time. Show the reschedule of the bay and technician hours, not only the job card update.

Map your own additional work approval

Open the additional work example as your own chart, change the urgency check and the call rule to match your workshop, and then assign the lanes.

Map your own additional work approval

Related guides

Frequently asked questions

How do I show a customer who does not reply?

As a loop. The No reply branch leads to a step that calls again and notes each attempt, then returns to the approval decision. Add the number of attempts your workshop allows in a comment.

What should happen to work the customer declines?

Record it on the vehicle history and complete the original work only. The job card at handover then shows both approved and declined work.

Which charts come before and after this one?

The check-in comes first: read /guides/how-to-map-a-car-dealership-service-department and /templates/vehicle-check-in-and-job-card-process. Parts are covered at /templates/workshop-parts-ordering-and-fitting-process and the final check at /templates/vehicle-quality-check-and-handover-process. Warranty work has its own chart at /templates/dealer-warranty-repair-claim-process.

Is the chart a statement of consent rules?

No. Authorisation and record keeping requirements differ by country and by workshop. The chart shows the structure; put your own rules in the labels and comments.

The template behind this guide

Workshop additional work authorisation process flowchart — Workshop additional work authorisation flowchart: technician finding, photo evidence, advisor quote, customer approval or decline, parts check, schedule change and a record of declined work.