How to Draw a Trades Company Org Chart (Electrician, Plumber, Roofer)
Draw a trades company org chart for an electrician, plumber or roofer firm: the owner, the office that dispatches work, the supervisors, the crews that move between sites and the support roles. Check it against a job card flowchart.
To draw a trades company org chart, put the owner at the top, add the manager who runs the work, then one supervisor for each crew or site and the crews under them, and draw the office that books and dispatches work as its own branch. This works for an electrician, plumber or roofer firm.
The short version
- Start with the owner, then the manager who runs the work, then one supervisor for each crew or site.
- Give every crew its own label, such as Crew A and Crew B, and keep each apprentice with the crew that teaches them.
- Draw the office as its own branch, because the people who price, book and order keep the crews working.
- Write the dispatch and phone-call lines in a caption, not as extra boxes.
- Treat the chart as illustrative, because trades firms vary a great deal in size and titles.
What a trades company org chart has to make clear
A trades company has a problem that an office-based business does not. Its people spend the day somewhere else. A crew leaves the yard or the van park in the morning, works at a customer's home or a building site and comes back, or does not come back for a week. The chart has to say who leads that crew while it is away, who sends it there and who it phones when something changes on the way. Draw those three answers first and the rest of the chart follows.
Start with the owner or managing director, then the manager who runs the work, called an operations manager, a service manager or a contracts manager depending on the firm. Under that manager put one supervisor for each crew or site, a foreman, a site supervisor or a lead, and under the supervisor put the crews themselves. Give each crew a distinct label, such as Crew A and Crew B, because the same trade title repeats and an org chart cannot use one label twice. The apprentice sits in the crew they learn from, so the person who teaches them is visible on the chart.
Then draw the office as a separate branch. In most trades firms a small group of people keeps the crews working: someone prices jobs, someone books and dispatches them, someone orders materials and keeps the vans stocked, someone answers customers and someone does the accounts. These roles do not lead crews, but crews depend on them every day. Hang them from the owner or the office manager, and describe the working lines that cross the tree in a caption, such as a dispatcher phoning a supervisor during the day. A tree has one parent per box.
The chart below follows an electrical contractor, and the same shape fits plumbing, roofing and landscaping firms. It is an illustrative, role-based example. It names no real company and states no licensing, certification, safety, insurance or employment rule. Check the rules where you operate. Sizes and titles vary by company, trade, country and budget. A second chart, a vehicle check-in and job card flowchart, is used here as a generic job card pattern for testing who owns each step from a booking to a crew starting work.
Build the trades company org chart in five stages
Watch the editable chart grow from the owner and manager to the crews on site, the service team, the stores and the office.
Start with the owner and the manager who runs the work
The owner sits alone at the top with the operations manager beneath. Everything that goes out in a van runs through the operations manager, which is why the crews hang from this box.
Add one contract, its supervisor and its crews
A contracts manager owns a book of work, a site supervisor leads the site and two crews work under the supervisor with an apprentice beside them. This pattern repeats for every contract the firm runs.
Add the second site and the small works
A second site gets its own supervisor and crew, and domestic and small works get a contracts manager of their own. Crew labels stay distinct, so the chart can say which crew is where as work moves between sites.
Add the service team and the stores
The service and maintenance team answers calls and planned visits, so it moves between customers every day. Procurement and stores sit in the same branch, because materials and vans follow the crews.
Finish with the office that supports the crews
Estimating, design, health and safety and the office manager sit beside operations. They price, plan and book the work, and the office manager's administrators are the people who dispatch crews and answer customers.
Check the structure against a process: a job card from booking to start
A job card process runs from a booking through a walk-round, a written card and an estimate to the person who does the work. It is built here in three stages so you can see who owns each step. Read it as a generic pattern and swap in your own steps, such as a site visit or a van dispatch.
Write the steps and decisions
Start with the arrival, the greeting, the walk-round and the notes. At this stage it is only a sequence. Nobody owns any box yet, which is the question a trades chart answers.
Assign each step to a role
Give each step a lane that matches a role on the chart, such as the office, the supervisor or the crew. A step that fits no box means the chart is missing a role or the process has no owner.
Complete the route
The full process adds the estimate decision, the allocation of the person who does the work and the handover of the keys. Where a step needs a decision, check that the deciding role exists on the chart.
How it works
Start with the owner
Put the owner or managing director alone at the top. In a very small firm this is also the estimator and the supervisor, and the chart can say so in a note.
Add the manager who runs the work
Place the operations, service or contracts manager under the owner. Use one manager per book of work if the firm runs commercial and domestic work separately.
Add supervisors and crews
Hang one supervisor for each site or crew under the manager, then the crews under the supervisor. Give repeated trade titles distinct labels, such as Crew A and Crew B, and place each apprentice in the crew they learn from.
Add the service team and stores
Draw the crew that answers calls as its own branch, with procurement and stores beside it, because both follow the vans and not one site.
Draw the office
Add estimating, design, health and safety and the office manager with the administrators who book and dispatch. Add a caption for the lines that cross the tree.
Check it against a process
Open a job card flowchart, give each step a lane that matches a role and fix the gaps in the chart or in the process.
Mistakes to avoid
Hiding the office
A chart with crews only makes the firm look as if it runs itself. The office that books, orders and answers the phone is where most delays start, so draw it.
Giving every crew member a box
Crews change with every contract and holiday. Draw the crew as a role with a distinct label and keep names in a note.
Placing the apprentice under the owner
An apprentice learns from a crew every day. Placing the box under the owner hides who teaches and checks the work.
Copying a larger firm
A one-van firm and a fifty-van firm do not share a chart. Draw the roles you have, merge the ones one person holds and read the chart as an illustration.
Editable organizational charts
Create your trades company org chart
Open the editable electrical contractor team structure, rename the roles to match your trade and add or remove crews.
Related guides
Frequently asked questions
Which trades is this chart for?
The example follows an electrical contractor, and the same shape fits plumbing and heating, roofing, landscaping and cleaning firms, where crews work away from the office and a small team keeps them supplied. Rename the trade roles, keep the owner, manager, supervisors, crews and office, and add or remove boxes to match your firm.
How does a one-person firm use this chart?
Draw every box you can name and put the same person in several of them with a note. An owner who prices the work, drives the van and does the invoicing holds three boxes. That shows which jobs exist and which ones will need a hire first when the firm takes on its first employee.
Where does the dispatcher sit?
Usually in the office, under the office manager or the owner, and in a plumbing or service firm often as a role of its own. Draw the dispatcher where the person reports. Then add a caption saying that the dispatcher phones supervisors and crews all day, because a tree cannot show that.
Does this chart state licensing or safety rules?
No. It is an illustrative, role-based example. Licensing, certification, insurance, safety and employment rules depend on your trade and country, so check those separately and do not read the chart as a statement of what must be in place in any firm.
Where do I go next after the trades chart?
Open the editable template at [electrical contractor team structure](/org-templates/electrical-contractor-team-structure). For other trades see [plumbing and heating company team structure](/org-templates/plumbing-and-heating-company-team-structure), [roofing company team structure](/org-templates/roofing-company-team-structure), [landscaping company team structure](/org-templates/landscaping-company-team-structure), [commercial cleaning company team structure](/org-templates/commercial-cleaning-company-team-structure) and [independent garage team structure](/org-templates/independent-garage-team-structure). For the process side see [vehicle check-in and job card process](/templates/vehicle-check-in-and-job-card-process).