The 8 wastes of Lean in the office, with examples

The eight wastes of Lean (transport, inventory, motion, waiting, overproduction, overprocessing, defects and skills) explained for office work, with an example of each from an order-to-cash process.

Lean names eight kinds of waste. They began on the factory floor, and all eight turn up in offices, where they hide in inboxes, approvals and spreadsheets.

The short version

  • Waste is any time or effort that does not make the result better for the customer.
  • Waiting and inventory take most of the elapsed time in a typical office process.
  • An office defect is missing or wrong information that sends work back.
  • Overprocessing includes retyping, extra checks and approvals that never refuse.
  • Every waste is a step, a form or a handoff, so describe it that way.

Waste that has become normal

Waste is anything that takes time or effort without making the result any better for the customer. Taiichi Ohno described seven kinds in the Toyota Production System, and Jeffrey Liker's The Toyota Way added an eighth, the unused knowledge and creativity of employees. English-speaking teams often remember them as TIMWOODS: transport, inventory, motion, waiting, overproduction, overprocessing, defects and skills.

In an office the eight look different from a factory. Transport is an email forwarded to someone who only passes it on. Inventory is a full inbox or a weekly run. Waiting is a case parked for an approval. Overprocessing is the same details typed into two systems. None of it looks like waste to the person doing it, because it has become the way the work is done.

The example below is an order-to-cash process, from the customer's order to the cash in the bank. Step through it and look for each waste where the work stops, loops or is done twice.

Eight wastes in one order-to-cash process

From the customer's order to the cash. At each stage, name the wastes you can see.

  1. Defects at the start

    An order arrives without complete details and goes back to the customer. Missing information at the first step is the office version of a defect: every case that loops back here is work done twice, and the loop costs a day each time the customer takes a day to answer.

  2. Waiting on a credit decision

    Orders over the credit limit are held while credit control decides. A hold is waiting in its purest form: nobody works on the case and the customer feels every hour of it. Ask how often the hold is released, because a check that almost always says yes may cost more than it saves.

  3. Motion and inventory around the invoice

    Dispatch, proof of delivery and the invoice pass between three teams. Chasing the carrier for proof is motion, and invoices issued in a weekly run are inventory: work finished and then held. Each handoff on the map is a queue where the case can wait.

  4. Overprocessing and skills in disputes

    Deductions are coded, investigated and credited, and late payers go round a dunning ladder. Look for details typed into two systems and approvals that are always granted. The people who work the ladder usually know which steps they would remove, and asking them is the cure for the eighth waste.

How it works

  1. Map the process first

    Waste shows best on a map of the whole process, drawn with the people who run it. Draw one lane per team and every step as it runs today.

  2. Read out the problems at each step

    Ask the person who does each step what goes wrong there and write it under the step in their words. Most office waste is already known to the people who live with it.

  3. Name the waste behind each problem

    Use the eight names as a checklist. One problem can be two wastes at once, such as an approval that adds both waiting and overprocessing.

  4. Put a time on the biggest ones

    Write the waiting time after each step. The longest waits are usually inventory or waiting, and they are where a fix pays most.

  5. Choose three fixes

    Place the ideas on an impact and effort grid and take three from the high-impact, low-effort corner, each with an owner and a date.

  6. Check after a month

    Measure the one number you meant to move, from real cases, and redraw the map with the fixes in place.

Mistakes to avoid

  • Blaming people

    Every waste is a step, a form or a handoff. Say so out loud when a problem starts to sound like a complaint about a colleague.

  • Hunting every waste at once

    A list of forty wastes produces no fixes. Circle the longest waits and start there.

  • Leaving out the customer's steps

    The customer waits through their own steps too. Keep them on the map even when the team cannot change them.

  • Treating every wait as a capacity problem

    A batch held for Friday is fixed by changing the schedule. Adding people to it changes nothing.

Find the waste in your process

Open the order-to-cash example as your own chart, replace the steps with yours and write the problems under each one.

Find the waste in your process

Related guides

Frequently asked questions

What are the 8 wastes of Lean?

Transport, inventory, motion, waiting, overproduction, overprocessing, defects and unused skills. The first seven come from Taiichi Ohno's description of the Toyota Production System. The eighth was added later and is often listed as skills or unused talent.

What does TIMWOODS stand for?

Transport, inventory, motion, waiting, overproduction, overprocessing, defects and skills: the eight wastes of Lean in the order of an English mnemonic.

What is an example of waste in an office?

A purchase order waiting days for a signature is waiting. Invoices paid in a weekly run are inventory. A form retyped into a second system is overprocessing, and a new starter's form without a bank account number is a defect.

How do you find waste in a process?

Map the process with the people who run it, write the processing time, the waiting time and the problems under every step and name the waste behind each problem. The free guide Find the Waste walks through a 90-minute workshop that does exactly this.